My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Page 15 of 16 <br /> Snohomish Sprinkler Fitters (Fire Protection) Journey Level $70.14 5C 1X <br /> I :Snohomish Stage Rigging Mechanics (Non Journey Level $13.23 1 <br /> Structural) <br /> Snohomish Stone Masons Journey Level $52.82 5A 1M <br /> I Snohomish Street And Parking Lot Sweeper Journey Level $15.00 1 <br /> Workers <br /> Snohomish Surveyors Assistant Construction Site $56.00 7A 3C 8P <br /> Surveyor <br /> Snohomish Surveyors Chainman $55.47 7A 3C 8P <br /> •Snohomish Surveyors Construction Site Surveyor $56.94 7A 3C 8P <br /> I <br /> :Snohomish Telecommunication Technicians Journey Level $22.38 1 <br /> Snohomish Telephone Line Construction - Cable Splicer $37.60 5A 2B <br /> Outside <br /> I <br /> Snohomish Telephone Line Construction - Hole Digger/Ground Person $20.79 5A 2B <br /> Outside E <br /> II Snohomish Telephone Line Construction - Installer (Repairer) $36.02 5A 2B <br /> Outside <br /> 'Snohomish Telephone Line Construction - Special Aparatus Installer I $37.60 5A 2B <br /> Outside <br /> I Snohomish Telephone Line Construction - Special Apparatus Installer II $36.82 5A 2B <br /> Outside <br /> I •Snohomish Telephone Line Construction - Telephone Equipment Operator $37.60 5A 2B <br /> Outside (Heavy) <br /> Snohomish Telephone Line Construction - Telephone Equipment Operator $34.94 5A 2B <br /> I <br /> Outside (Light) <br /> Snohomish Telephone Line Construction - Telephone Lineperson $34.93 5A 2B <br /> Outside <br /> ;Snohomish Telephone Line Construction - Television Groundperson $19.73 5A 213 <br /> Outside <br /> 'Snohomish Telephone Line Construction - Television Lineperson/Installer $26.31 5A 2B <br /> I <br /> li Outside <br /> Snohomish Telephone Line Construction - Television System Technician $31.50 5A 2B <br /> , Outside <br /> ' `Snohomish Telephone Line Construction - Television Technician $28.23 5A 2B <br /> Outside <br /> Snohomish Telephone Line Construction - Tree Trimmer $34.93 5A 213 <br /> Outside <br /> I Snohomish Terrazzo Workers Journey Level $47.46 5A 1M <br /> Snohomish Tile Setters Journey Level $47.46 5A 1M <br /> I 'Snohomish Tile, Marble Et Terrazzo Finishers Finisher $38.29 5A 1B <br /> :Snohomish Traffic Control Stripers Journey Level $43.73 7A 1K <br /> Snohomish Truck Drivers Asphalt Mix Over 16 Yards (W. $51.25 5D 3A 8L <br /> WA-Joint Council 28) <br /> t Snohomish Truck Drivers Asphalt Mix To 16 Yards (W. WA- $50.41 5D 3A 8L , <br /> Joint Council 28) <br /> ISnohomish Truck Drivers Dump Truck $37.94 1 <br /> Snohomish Truck Drivers Dump Truck And Trailer $38.52 1 <br /> ISnohomish Truck Drivers Other Trucks $38.52 1 <br /> !I Snohomish Truck Drivers Transit Mixer $34.63 1 <br /> {Snohomish Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.05 1 <br /> I <br /> Installers <br /> httns://fortress.wa.gov/Ini/wagelookun/nrvWagelookun.asnx 3/16/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.