My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 COEdNTRO 20.16:4RSTF <br /> 2 INTRODUCTION TO THE SPECIAL PROVISIONS <br /> 3 (August 14, 2013 APWA GSP) <br /> 4 <br /> 5 The work on this project shall be accomplished in accordance with the Standard <br /> 6 Specifications for Road, Bridge and Municipal Construction, 2016 edition, as issued by the <br /> 7 Washington State Department of Transportation (WSDOT) and the American Public Works <br /> 8 Association (APWA), Washington State Chapter (hereafter "Standard Specifications"). The <br /> 9 Standard Specifications, as modified or supplemented by the Amendments to the Standard <br /> 10 Specifications and these Special Provisions, all of which are made a part of the Contract <br /> 11 Documents, shall govern all of the Work. <br /> 12 <br /> 13 These Special Provisions are made up of both General Special Provisions (GSPs) from <br /> 14 various sources, which may have project-specific fill-ins; and project-specific Special <br /> 15 Provisions. Each Provision either supplements, modifies, or replaces the comparable <br /> 16 Standard Specification, or is a new Provision. The deletion, amendment, alteration, or <br /> 17 addition to any subsection or portion of the Standard Specifications is meant to pertain only <br /> 18 to that particular portion of the section, and in no way should it be interpreted that the <br /> 19 balance of the section does not apply. <br /> 20 <br /> 21 The project-specific Special Provisions are not labeled as such. The GSPs are labeled <br /> 22 under the headers of each GSP, with the effective date of the GSP and its source. For <br /> 23 example: <br /> 24 <br /> 25 (March 8, 2013 APWA GSP) <br /> 26 (April 1, 2013 WSDOT GSP) <br /> 27 <br /> 28 Also incorporated into the Contract Documents by reference are: <br /> 29 E Manual on Uniform Traffic Control Devices for Streets and Highways, currently <br /> 30 adopted edition, with Washington State modifications, if any <br /> 31 E Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, <br /> 32 current edition <br /> 33 D City° of;?Everett `Design 'and. ,Construction7Standards . and ,Specifications ';;for <br /> 34 Development <br /> 35 <br /> 36 Contractor shall obtain copies of these publications, at Contractor's own expense. <br /> 37 <br /> 38 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021); COE#3540 SP-5 March 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.