Laserfiche WebLink
1 Notice to Proceed <br /> 2 The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br /> 3 and directing the Contractor to proceed with the Work and establishing the date on <br /> 4 which the Contract time begins. <br /> 5 <br /> 6 Traffic <br /> 7 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, <br /> 8 and equestrian traffic. <br /> 9 <br /> 10 11j 02 G k1 <br /> 11 Bid Procedures and Conditions <br /> 12 <br /> 13 02M'I �T <br /> 14 1-02 BID PROCEDURES AND CONDITIONS <br /> 15 <br /> 16 1-02.1 Prequalification of Bidders <br /> 17 <br /> 18 Delete this section and replace it with the following: <br /> 19 <br /> 20 1-02.1 Qualifications of Bidder <br /> 21 (January 24, 2011 APWA GSP) <br /> 22 <br /> 23 Before award of a public works contract, a bidder must meet at least the minimum <br /> 24 qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified <br /> 25 to be awarded a public works project. <br /> 26 <br /> 27 G0,OE, 1022RTF <br /> 28 1-02.2 Plans and Specifications <br /> 29 (June 27, 2011 APWA GSP) <br /> 30 <br /> 31 Delete this section and replace it with the following: <br /> 32 <br /> 33 Information as to where Bid Documents can be obtained or reviewed can be found in the <br /> 34 Call for Bids (Advertisement for Bids) for the work. <br /> 35 <br /> 36 After award of the contract, plans and specifications will be issued to the Contractor at <br /> 37 no cost as detailed below: <br /> 38 <br /> To Prime Contractor No. of Sets Basis of Distribution <br /> Reduced plans (11" x 17") 10' Furnished automatically <br /> upon award. <br /> Contract Provisions 5 Furnished automatically <br /> upon award. <br /> Large plans (e.g., 22" x 5 Furnished only upon <br /> 34") request. <br /> 39 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021);COE#3540 SP-9 March 16, 2016 <br />