Laserfiche WebLink
1 3. A progress schedule (in a form the Contracting Agency requires) showing the order <br /> 2 of and time required for the various phases of the work, <br /> 3 4. A breakdown of costs assigned to any bid item, <br /> 4 5. Attendance at a conference with the Engineer or representatives of the Engineer, <br /> 5 6. Obtain, and furnish a copy of, a business license to do business in the city or county <br /> 6 where the work is located. <br /> 7 7. Any other information or action taken that is deemed necessary to ensure that the <br /> 8 bidder is the lowest responsible bidder. <br /> 9 <br /> 10 <br /> 11 b1 03 1f 7) RTF <br /> 12 1-03.1(1) Identical Bid Totals <br /> 13 (January 4, 2016 APWA GSP) <br /> 14 <br /> 15 Revise this section to read: <br /> 16 <br /> 17 After opening Bids, if two or more lowest responsive Bid totals are exactly equal, then <br /> 18 the tie-breaker will be the Bidder with an equal lowest bid, that proposed to use the <br /> 19 highest percentage of recycled materials in the Project, per the form submitted with the <br /> 20 Bid Proposal. If those percentages are also exactly equal, then the tie-breaker will be <br /> 21 determined by drawing as follows: Two or more slips of paper will be marked as follows: <br /> 22 one marked "Winner" and the other(s) marked "unsuccessful". The slips will be folded to <br /> 23 make the marking unseen. The slips will be placed inside a box. One authorized <br /> 24 representative of each Bidder shall draw a slip from the box. Bidders shall draw in <br /> 25 alphabetic order by the name of the firm as registered with the Washington State <br /> 26 Department of Licensing. The slips shall be unfolded and the firm with the slip marked <br /> 27 "Winner" will be determined to be the successful Bidder and eligible for Award of the <br /> 28 Contract. Only those Bidders who submitted a Bid total that is exactly equal to the lowest <br /> 29 responsive Bid, and with a proposed recycled m aterials percentage that is exactly equal <br /> 30 to the highest proposed recycled materials amount, are eligible to draw. <br /> 31 <br /> 32 COE ; :Rte, T <br /> 33 1-03.3 Execution of Contract <br /> 34 (October 1, 2005 APWA GSP) <br /> 35 <br /> 36 Revise this section to read: <br /> 37 <br /> 38 Copies of the Contract Provisions, including the unsigned Form of Contract, will be <br /> 39 available for signature by the successful bidder on the first business day following <br /> 40 award. The number of copies to be executed by the Contractor will be determined by the <br /> 41 Contracting Agency. <br /> 42 <br /> 43 Within 20 calendar days after the award date, the successful bidder shall return <br /> 44 the signed Contracting Agency-prepared contract, an insurance certification as required <br /> 45 by Section 1-07.18, and a satisfactory bond as required by law and Section 1-03.4. <br /> 46 Before execution of the contract by the Contracting Agency, the successful bidder shall <br /> 47 provide any pre-award information the Contracting Agency may require under Section 1- <br /> 48 02.15. <br /> 49 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021); COE#3540 SP-15 March 16, 2016 <br />