My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 Q9 9(Pa meets; R4TF <br /> 2 1-09.9 Payments <br /> 3 (March 13, 2012 APWA GSP) <br /> 4 <br /> 5 Delete the first four paragraphs and replace them with the following: <br /> 6 <br /> 7 The basis of payment will be the actual quantities of Work performed according to the <br /> 8 Contract and as specified for payment. <br /> 9 <br /> 10 The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> 11 Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> 12 performed on a monthly basis. A breakdown is not required for lump sum items that <br /> 13 include a basis for incremental payments as part of the respective Specification. Absent <br /> 14 a lump sum breakdown, the Project Engineer will make a determination based on <br /> 15 information available. The Project Engineer's determination of the cost of work shall be <br /> 16 final. <br /> 17 <br /> 18 Progress payments for completed work and material on hand will be based upon <br /> 19 progress estimates prepared by the Engineer. A progress estimate cutoff date will be <br /> 20 established at the preconstruction conference. <br /> 21 <br /> 22 The initial progress estimate will be made not later than 30 days after the Contractor <br /> 23 commences the work, and successive progress estimates will be made every month <br /> 24 thereafter until the Completion Date. Progress estimates made during progress of the <br /> 25 work are tentative, and made only for the purpose of determining progress payments. <br /> 26 The progress estimates are subject to change at any time prior to the calculation of the <br /> 27 final payment. <br /> 28 <br /> 29 The value of the progress estimate will be the sum of the following: <br /> 30 1. Unit Price Items in the Bid Form —the approximate quantity of acceptable units of <br /> 31 work completed multiplied by the unit price. <br /> 32 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum <br /> 33 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 34 determination. <br /> 35 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site <br /> 36 or other storage area approved by the Engineer. <br /> 37 4. Change Orders —entitlement for approved extra cost or completed extra work as <br /> 38 determined by the Engineer. <br /> 39 <br /> 40 Progress payments will be made in accordance with the progress estimate less: <br /> 41 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 42 2. The amount of progress payments previously made; and <br /> 43 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br /> 44 Contract Documents. <br /> 45 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021);COE#3540 SP-63 March 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.