My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 from the Contract are filed with the Contracting Agency or initiated in court, the <br /> 2 Contractor shall permit the Contracting Agency to have timely access to any records <br /> 3 deemed necessary by the Contracting Agency to assist in evaluating the claims or <br /> 4 action. <br /> 5 <br /> 6 I, 09 =1`3(3KRTF <br /> 7 1-09.13(3) Claims $250,000 or Less <br /> 8 (October 1, 2005 APWA GSP) <br /> 9 <br /> 10 Delete this section and replace it with the following: <br /> 11 <br /> 12 The Contractor and the Contracting Agency mutually agree that those claims that total <br /> 13 $250,000 or less, submitted in accordance with Section 1-09.11 and not resolved by <br /> 14 nonbinding ADR processes, shall be resolved through litigation unless the parties <br /> 15 mutually agree in writing to resolve the claim through binding arbitration. <br /> 16 <br /> 17 1 091(3) RAF <br /> 18 1-09.13(3)A Administration of Arbitration <br /> 19 (July 23, 2015 APWA GSP) <br /> 20 <br /> 21 Revise the third paragraph to read: <br /> 22 <br /> 23 The Contracting Agency and the Contractor mutually agree to be bound by the decision <br /> 24 of the arbitrator, and judgment upon the award rendered by the arbitrator may be <br /> 25 entered in the Superior Court of the county in which the Contracting Agency's <br /> 26 headquarters is located, provided that where claims subject to arbitration are asserted <br /> 27 against a county, RCW 36.01.05 shall control venue and jurisdiction of the Superior <br /> 28 Court. The decision of the arbitrator and the specific basis for the decision shall be in <br /> 29 writing. The arbitrator shall use the Contract as a basis for decisions. <br /> 30 <br /> 31 X11Q GR11 <br /> 32 Temporary Traffic Control <br /> 33 <br /> 34 1,x;10 2GR1 <br /> 35 Traffic Control Management <br /> 36 <br /> 37 (.17413.4a:01 <br /> 38 General <br /> 39 <br /> 40 i1,„10 2L1) IIVST1OR1a <br /> 41 Section 1-10.2(1) is supplemented with the following: <br /> 42 <br /> 43 1�: 1021) OPT7GR'1 <br /> 44 (January 8, 2016) <br /> 45 Only training with WSDOT TCS card and WSDOT training curriculum is recognized <br /> 46 in the State of Washington. The Traffic Control Supervisor shall be certified by one <br /> 47 of the following: <br /> 48 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021); COE#3540 SP-65 March 16,2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.