Laserfiche WebLink
1 <br /> 2 (******) <br /> 3 <br /> 4 "Sawcut", per Linear Foot. <br /> 5 Saw-cutting shall be performed in accordance with Sections 2-02.3(3). <br /> 6 <br /> 7 The unit price per linear foot for the final saw-cutting of asphalt pavement, up to 8.5- <br /> 8 inch thickness, shall be full pay for all labor, materials, tools, and equipment necessary <br /> 9 to satisfactorily complete the Work as specified in Section 2-02.3(3) of the Standard <br /> 10 Specifications and disposal of cuttings slurry, including vacuum collection. <br /> 11 <br /> 12 All labor, materials, tools and equipment necessary to disposal of cuttings slurry, <br /> 13 including vacuum collection, shall be included in the Contract Unit Price. <br /> 14 <br /> 15 <br /> 16 YiblitgA <br /> 17 Construction Requirements <br /> 18 <br /> 19 02x3 1 S 1G_FZ2 <br /> 20 Section 2-02.3 is supplemented with the following: <br /> 21 <br /> 22 F2il023iodt2 d'o`cx <br /> 23 (March 13, 1995) <br /> 24 Removing Miscellaneous Traffic Items <br /> 25 The following miscellaneous traffic items shall be removed and disposed of: <br /> 26 <br /> 27 *** <br /> Sheet REI Remove 2 sections of the bike rack- Cap off and <br /> Debur cut edge. .. <br /> ■ Removal of 7 trees and their respective root <br /> systems as indicated on plans. <br /> 28 <br /> 29 *** <br /> 30 <br /> 31 gatbj—.;ISIO. 2r <br /> 32 END DIVISION 2 <br /> 33 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021); COE#3540 SP-68 March 16, 2016 <br />