My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pellco Construction, Inc. 6/22/2016
>
Contracts
>
Capital Contract
>
Pellco Construction, Inc. 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2016 11:29:57 AM
Creation date
7/13/2016 10:48:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pellco Construction, Inc.
Approval Date
6/22/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hawthorne Elementary Safe Routes to School
Public Works WO Number
PW 3450
Tracking Number
0000164
Total Compensation
$378,958.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Pellco Construction, Inc. 9/20/2016 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 Fertilizer shall be standard commercial grade of formulation. Fifty percent of the <br /> 3 nitrogen shall be derived from 38% ureaformaldehyde and apply at the rate of 12 <br /> 4 pounds per 1000 square feet. <br /> 5 <br /> 6COE 8M1 .1 4C RTF <br /> 7 8-01.3(2)D Mulching <br /> 8 Section 8-01.3(2)D shall be supplemented with the following: <br /> 9 <br /> 10 (******) <br /> 11 <br /> 12 Wood cellulose fiber mulch shall be specially processed wood fiber containing no growth or <br /> 13 germination inhibiting factors, and shall be dyed a suitable color to facilitate inspection of the <br /> 14 placement of the material. It shall be manufactured in such manner that after addition and <br /> 15 agitation in slurry tanks with water, the fibers in the material will become uniformly <br /> 16 suspended to form a homogeneous slurry. When hydraulically sprayed on the ground, the <br /> 17 material shall allow the absorption and percolation of moisture. <br /> 18 <br /> 19 Wood cellulose fiber shall be applied at the rate of*** 60 *** pounds per*** 1,000*** square <br /> 20 feet. <br /> 21 <br /> 22 8 Po2,f:: ®P; - <br /> 23 (January 3, 2006) <br /> 24 Fertilizer shall be a commercially prepared mix of 10-20-20 and shall be <br /> 25 applied at the rate of 10 pounds per 1000 square feet. <br /> 26 <br /> 27 - <br /> 28 Roadside Restoration <br /> 29 <br /> 30 802:1 <br /> 31 Description <br /> 32 <br /> 33 $02 INS 'I,G 8 <br /> 34 Section 8-02.1 is supplemented with the following: <br /> 35 <br /> 36 '0 1 �.'' <br /> 37 (August 4, 2014) <br /> 38 This work shall consist of removing and disposing of buried man-made debris that may <br /> 39 be encountered during soil amendment incorporation or excavation for irrigation <br /> 40 systems. <br /> 41 <br /> 42 •�02 .®IP 1�4` _®8 <br /> 43 (August 4, 2014) <br /> 44 Removal of Buried Man-Made Debris <br /> 45 The Contractor shall remove buried man-made debris as directed by the Engineer <br /> 46 to a maximum depth of two feet. The excavated debris shall be removed from the <br /> 47 project site to a disposal facility approved by the Engineer. <br /> 48 <br /> HAWTHORNE ELEMENTARY <br /> SAFE ROUTES TO SCHOOL <br /> FED AID#SRTS-0420(021);COE#3540 SP-80 March 16, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.