Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-05.6(3) Materials and Equipment Furnished by City <br /> (******) <br /> Contractor shall install materials and Equipment furnished by the City as provided in r <br /> the technical sections of the Specifications. Contractor shall coordinate with the City <br /> on installation and testing of City-furnished materials, such as sensors, controls, <br /> metering and wiring. Furnishing of material and Equipment by the City will be <br /> considered conclusive evidence of their acceptability for the purpose intended. If the <br /> Contractor discovers defects in material or Equipment furnished by the City, it shall <br /> immediately notify the City. After such discovery, the Contractor shall not proceed with <br /> Work involving City-furnished materials and Equipment unless authorized by the City. <br /> Unless otherwise noted or specifically stated, materials and Equipment furnished by <br /> the City, that are not of local occurrence or manufacture, are considered to be "FOB" <br /> railroad station or truck terminal nearest to the site of the Work. At no cost to the City, <br /> the Contractor shall unload, transport, store, and protect such material and Equipment <br /> from damage. The Contractor shall inspect such City-furnished material and <br /> Equipment on receipt and provide the City with written acceptance for the incorporation <br /> of said material and Equipment into the Work. After receipt by the Contractor, the <br /> Contractor bears all risk of loss and casualty to City furnished materials and <br /> Equipment. <br /> 1-05.7 Removal of Defective and Unauthorized Work <br /> Supplement 1-05.7 by adding the following: <br /> If the Contractor fails to remedy defective or unauthorized Work within the time <br /> specified in a written notice from the Engineer, or fails to perform Work required by the <br /> Contract Documents, the Engineer may correct and remedy such Work as may be <br /> identified in the written notice, with City forces or by such other means as the City may <br /> deem necessary. <br /> If the Contractor fails to comply with a written order to remedy what the Engineer <br /> determines to be an emergency situation, the Engineer may have the defective and <br /> unauthorized Work corrected immediately, have the rejected Work removed and <br /> replaced, or have Work the Contractor refuses to perform completed by using City or <br /> other forces. An emergency situation is a situation when, in the opinion of the <br /> Engineer, a delay in its remedy could be potentially unsafe, or might cause serious risk <br /> of loss or damage to the public. <br /> Direct or indirect costs incurred by the City attributable to correcting and remedying <br /> defective or unauthorized Work, or Work the Contractor failed or refused to perform, <br /> shall be paid by the Contractor. Payment will be deducted by the Engineer from <br /> monies due, or to become due, the Contractor. Such direct and indirect costs shall <br /> include in particular, but without limitation, compensation for additional professional <br /> services required, and costs for repair and replacement of Work of others destroyed or <br /> damaged by correction, removal, or replacement of the Contractor's unauthorized <br /> Work. <br /> In its sole discretion, the City may retain Work that is not in compliance with the <br /> Contract. The City will determine the just and reasonable value for such defective <br /> Work and deductions will be made in the payments due or to become due to the <br /> Contractor. Final Acceptance will not act as a waiver of the City's right to recover from <br /> the Contractor an amount representing the deduction for retention of defective Work. I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-84 <br />