Laserfiche WebLink
i <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Examples of Construction Contractor and CPL responsibilities and interaction include, but <br /> are not limited to, the following: <br /> j • CPL shall provide timely and regular communications with the City, residents, <br /> business/institution owners, and managers and any other persons affected by the <br /> construction to inform them of the status of scheduled work activities as needed. <br /> • If a complaint, question or issue should arise from the public (a resident, motorist, <br /> business owner etc.), that requires action by the Sewer M Project construction <br /> team, the CPL shall communicate that information to the Construction Manager and <br /> otherwise interface as needed between the public and the contractor to assure that <br /> the issue is resolved promptly. <br /> • CPL and the City's inspector and construction manager shall attempt to contact or <br /> otherwise meet with each individual business/institution owner or manager and <br /> affected residents to identify specific concerns in advance of construction and to <br /> promptly address specific needs during construction. <br /> • City, in coordination with the CPL, shall provide notices of impending temporary <br /> ' closures of streets, alleys or driveways that are otherwise used for access to <br /> parking lots or buildings along the area of work. The text and information contained <br /> on any notices shall be jointly prepared by the Construction Manager and the CPL. <br /> • Contractor, in coordination with the CPL, shall provide notices to business/institution <br /> owners and managers and/or affected residents of temporary shutdown of utilities. <br /> The text and information contained on any notices shall be jointly prepared by the <br /> Construction Manager and the CPL. <br /> • Contractor and CPL shall provide assistance to business/institution owners and <br /> ' managers and/or affected residents to minimize and mitigate impacts during <br /> construction, including but not limited to; mail and package delivery, garbage and <br /> recycling pickup, freight delivery, handicap parking and access, customer/patient <br /> access and parking etc. <br /> • Contractor and CPL will coordinate to ensure needs of the community are <br /> incorporated into the contractor's construction schedule and timely updates <br /> furnished to the public. <br /> • CPL shall have phone numbers with 24-hour telephone message capability for <br /> business/institution owners and managers and/or affected residents to request <br /> assistance or information regarding issues related to the construction project. <br /> • CPL will maintain a written log of all communications with businesses, institutions or <br /> residents that involve complaints or issues requiring response or action by the City <br /> or the construction contractor. This log will be made available for review by the <br /> Owner's Representative upon request. <br /> I <br /> 1 <br /> ' SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-111 <br /> I <br />