Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Each of the two Construction Identification Signs shall have a "Project <br /> ject <br /> Information Sign" plan attached to the surface of the sign face in accordance <br /> with COE Standard Plan No. 713. The Construction Identification Sign shall <br /> contain three lines of information: <br /> PROJECT NAME: <br /> PROJECT FUNDING: <br /> PROJECT COST: <br /> c. The above information shall be provided by the Engineer. <br /> d. The Construction Identification Signs shall be erected on portable wood sign <br /> frames. Sign frames shall be constructed with treated 4" x 4" wooden posts, <br /> as shown on the "Construction Identification Sign Stand" detail on COE <br /> Standard Plan No. 711. Signs and sign frames shall be maintained by the <br /> Contractor in a clearly legible condition throughout the progress of the Work <br /> and shall be completely removed upon completion of the project and <br /> delivered to the City's storage area for future use by the City. <br /> e. No separate payment for Construction Identification Signs will be made. All <br /> costs associated with this item shall be merged with the unit contract price for <br /> "Mobilization." <br /> 2. Engineer's Field Office: The Contractor shall provide an office for the use of the <br /> Engineer that may be in conjunction or attached to the Contractor's field office. <br /> Sanitary facilities shall be nearby. The location of the office shall be adjacent to the <br /> project and at a location acceptable to the Contractor and the Engineer. The office <br /> shall be equipped with a desk, layout table, chairs and telephone and suitable <br /> lighting, air conditioning and heating. A telephone shall be installed for the sole use <br /> of the Engineer. It shall be a separate unit with a different telephone number than <br /> the Contractor's phone. Mutually agreeable measures for the security of the office <br /> shall be arranged between the Contractor and Engineer. The Engineer's office <br /> shall be on-site, connected to all utilities and fully prepared for occupancy prior to <br /> release of the first warrant to the Contractor. <br /> a. All costs for the Engineer's office, including telephone service for local calls <br /> only, shall be borne by the Contractor and shall be included in the <br /> mobilization cost. <br /> 1-09.9 Payments <br /> Delete 1-09.9 and substitute the following: <br /> 1-09.9 Payments to Contractors <br /> 1-09.9(1) Progress Payments <br /> Contractor shall submit progress payment estimate for completed Work and material <br /> on hand based upon acceptable Work performed during the previous month, or since <br /> the last partial payment estimate was submitted. Submit progress payment estimate to <br /> City's Representative by the tenth day of each month, or by schedule mutually agreed <br /> upon in writing by the Contractor and City's Representative at the Pre-Construction <br /> Conference. Contractor shall make initial progress estimate not later than 30 days <br /> after the Work begins. Make successive progress estimates every month thereafter <br /> until the Completion Date. <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No.— UP3470-10 Division 1 —GENERAL REQUIREMENTS April 2016 <br /> SP- 135 <br /> I <br />