My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> iv. Job overhead. <br /> v. Overhead (general and administrative). <br /> vi. Subcontractor's Contract Claims (in the same level of <br /> detail as specified herein is required for any <br /> subcontractor's Contract Claims); and <br /> ' vii. Other categories as specified by the Contractor or the <br /> City. <br /> 10. A notarized statement shall be submitted to the City's Representative <br /> containing the following language: <br /> Under the penalty of law for perjury or falsification, the undersigned, <br /> I <br /> (name) (title) <br /> I of <br /> (company) <br /> hereby certifies that the Contract Claim for extra compensation and <br /> extension of Contract Time, if any, made herein for Work on this <br /> Contract is a true and complete statement of the factual basis of the <br /> ' Contract Claim and all actual costs incurred and time sought, and is <br /> fully documented and supported under the Contract between the <br /> parties. <br /> ' Date /s/ <br /> Subscribed and sworn before me this day of <br /> Notary Public <br /> My Commission Expires: <br /> ' 1-09.11(2)C False Or Omitted Information <br /> The Contractor waives each Contract Claim for which it presents material <br /> information that it knows, or in the exercise of reasonable care should know, is <br /> false, or omits or fails to disclose material information relating to such Contract <br /> Claim. In such case, Contractor shall reimburse the City for any and all fees and <br /> expenses incurred in investigating any such Contract Claim. <br /> ' 1-09.11(3) Time Limitation and Jurisdiction <br /> (******) <br /> The parties intend that all claims and Disputes be dealt with promptly and expeditiously <br /> ' when they arise. The parties intend that all claims and Disputes be resolved quickly <br /> and expeditiously and desire to avoid claims and Disputes that relate back to events or <br /> Work occurring months before. The parties desire to avoid litigation and the costs and <br /> expense of claims and Disputes at the end of the Project. <br /> Any Contract Claim for adjustment of Contract Sum or Contract Time, or any Dispute <br /> or Contract Claim of any kind whatsoever, shall be submitted, if at all, to the City or <br /> City's Representative no later than thirty (30) calendar days after Notice was first <br /> required to be given by the Contractor as provided in 1-04.5 NOTICE BY THE <br /> CONTRACTOR. Failure to submit a Contract Claim within the thirty (30) calendar <br /> ' SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP- 143 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.