My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum#1] <br /> I <br /> Cement Concrete Driveway 120 SY i.-S 5 2 <br /> I A-41 Entrance Type 3 _ ` <br /> A-42 Cement Concrete Sidewalk,4- 60 SY 50. - <br /> 3 000 , <br /> inch Thickness <br /> A-43 Concrete Perpendicular Curb 2 EA 2 4-700 <br /> 1 Ramp _ <br /> A-44 Concrete Parallel Curb Ramp 1 EA `� 2— f Q (2.---,3 50, <br /> IA-45 Survey Monuments 2 EA fCJ a, " [, Q , <br /> A-46 Pavement Marking 1 LS [ j GQU I [�7 00G. <br /> A-47 Grass Seed and Topsoil Type A 270 SY 3 ,2-'' t , . <br /> IA-48 Force Account 0.5 FA $200,000 $100,000 <br /> A-49 Stop Gate and Frames 1 IS 7 COD 7 ;DD. <br /> ISUBTOTAL $ lird22,°L52g-- <br /> SALES TAX U@ 9.2% $ (4c1, 1 t.-._. <br /> IBID AMOUNT -SCHEDULE A(Sanitary Sewer) $ 1r 7!2`2 4.4 <br /> I <br /> 1 <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE it <br /> WO No. - UP3470-10 Division P -PROPOSAL April 2016 <br /> SP-9 <br /> !vided see www.ba.com Alwa s Verify Scale <br /> to Builders Exchange of WA, Inc. For usage Conditions Agreement Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.