My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> is not, and any resulting Delay would be the responsibility of the <br /> 111 <br /> Contractor. Because the Contractor is responsible for ordering materials <br /> and Equipment, Contractor shall not be entitled to an adjustment of <br /> Contract Time or Contract Sum due to Delays caused by the lack of <br /> materials or Equipment. A strike, job action, slowdown, work to rule, or <br /> other job action or labor dispute or problem is not a Delay caused by a <br /> third party. <br /> 1-09.11A(3)D1 b Adjustment of Contract Time <br /> The Contractor shall be entitled to an extension of Contract Time for I <br /> Delays caused solely by a third party for whom neither the Contractor nor <br /> the City is responsible, or for any Delay caused solely by earthquake, <br /> flood, natural disasters, acts of war or acts of terrorism. Extension of , <br /> Contract Time shall be determined pursuant to 1-08.8 EXTENSIONS OF <br /> TIME. <br /> 1-09.11A(3)E Delays Caused Concurrently by Third Parties and Contractor i <br /> or City <br /> If a Delay is caused concurrently by (a) a third party, earthquake, flood, natural <br /> disasters, acts of war or acts of terrorism and (b) either the Contractor or the City, <br /> then the Contractor or City is only responsible for the amount of Delay it caused in <br /> excess of the Delay caused by the a third party, earthquake, flood, natural <br /> disasters, acts of war or acts of terrorism. <br /> 1-09.11A(3)E1 Adjustment of Contract Sum <br /> The Contractor shall be entitled to an adjustment of Contract Sum for any <br /> Delay concurrently caused by a third party and the City, but only to the extent <br /> Contractor clearly and convincingly demonstrates that the City caused the <br /> Delay to be longer than it would have been had it been caused solely by the <br /> third party. I <br /> 1-09.11A(3)E2 Adjustment of Contract Time <br /> The Contractor shall be entitled to an adjustment of Contract Time for any <br /> Delay concurrently caused by a third party and the City, but only to the extent <br /> Contractor clearly and convincingly demonstrates that the City caused the <br /> Delay to be longer than it would have been had it been caused solely by the <br /> third party. , <br /> 1-09.11A(4) Extended or Unabsorbed Overhead <br /> 1-09.11A(4)A General <br /> To present a request for additional compensation for Extended or Unabsorbed <br /> Overhead, the Contractor has the burden of keeping and maintaining accurate <br /> documentation to support any such claim. If the Contractor fails to provide or <br /> keep inadequate financial data for an accurate and fair Eichleay calculation, <br /> Contractor waives and releases any claim for Unabsorbed or Extended Overhead. <br /> In presenting any claim under this section of the Contract, the Contractor agrees <br /> to provide to the City any and all financial data needed by the City, or its <br /> representative, to review, substantiate and evaluate any claim for Extended or <br /> Unabsorbed Home Office Overhead, or both. Failure to provide the requested <br /> information shall constitute waiver by the Contractor. I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.— UP3470-10 Division 1 —GENERAL REQUIREMENTS April 2016 <br /> SP— 146 <br /> I <br />