My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> retained until the later of (a) completion of litigation, claim, or audit orb six years after <br /> the date of Final Acceptance. <br /> 1-09.12(2) Claims <br /> All Contract Claims filed against the City shall be subject to audit at any time following <br /> ' the filing of the Contract Claim. Failure of the Contractor, Subcontractors, or lower tier <br /> subcontractors to maintain and retain sufficient records to allow the auditors to verify <br /> all or a portion of the Contract Claim or to permit the auditor access to the books and <br /> ' records of the Contractor, Subcontractors, or lower tier subcontractors shall constitute <br /> a waiver of a Contract Claim and shall bar recovery in connection with the Contract. <br /> 1-09.12(3) Required Documents for Audits <br /> ' An audit may be performed by employees of the City or a representative of the City. <br /> The Contractor and its Subcontractors shall provide adequate facilities acceptable to <br /> the City for the audit during normal business hours. The Contractor and all <br /> ' Subcontractors shall cooperate with the City's auditors. <br /> As a minimum, the auditors shall have available to them the following documents: <br /> 1. Daily time sheets and supervisor's daily reports. <br /> 2. Collective Bargaining Agreements. <br /> 3. Insurance, welfare, and benefit records. <br /> 4. Payroll registers. <br /> ' 5. Earnings records. <br /> 6. Payroll tax forms. <br /> ' 7. Material invoices and requisitions. <br /> 8. Material cost distribution worksheet. <br /> 9. Equipment records (list of company equipment, rates, etc.) <br /> ' 10.Vendors', rental agencies', Subcontractors' and lower tier subcontractors' <br /> invoices. <br /> 11. Contracts between the Contractor and each of its Subcontractors, and all <br /> ' lower tier subcontractor contracts and supplier contracts. <br /> 12. Subcontractors' and lower tier subcontractors' payment certificates. <br /> ' 13. Canceled checks, including payroll and vendors. <br /> 14. Job cost reports, including monthly totals. <br /> 15. Job payroll ledger. <br /> ' 16. General ledger. <br /> 17. Cash disbursements journal. <br /> 18. Financial statements for all years reflecting the operations on this Contract. <br /> In addition, the City may require, if it deems appropriate, additional financial <br /> statements for 3 years preceding execution of the Contract and 3 years <br /> following Final Acceptance of the Contract. <br /> 19. Depreciation records on all company equipment whether these records are <br /> maintained by the company involved, its accountant, or others. <br /> 20. If a source other than depreciation records is used to develop costs for the <br /> Contractor's internal purposes in establishing the actual cost of owning and <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> WO No.- UP3470-10 Division 1 -GENERAL REQUIREMENTS April 2016 <br /> SP-149 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.