My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> CITY OF EVERETT SPECIAL PROVISIONS [Modified per Addendum#1] <br /> SUBCONTRACTORS FORM <br /> I 1. For heating, ventilation, air conditioning,plumbing (as defined by RCW Chap. 18.106) and electrical <br /> work(as defined by RCW Chap. 19.28), Bidder MUST either identify itself or Subcontractors in the <br /> chart below. If Bidder believes such work is not part of the scope of Work, Bidder shall write "NO <br /> I <br /> WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of work identified, unless <br /> Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor <br /> Iwill be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing and electrical work, Bidder fails (1) to <br /> submit as part of the Bid the names of such Subcontractors, (2) to name itself to perform such <br /> I <br /> Work, or(3)to write"No Work";or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air conditioning, plumbing, <br /> and electrical subcontractors applies only to proposed heating, ventilation and air conditioning, <br /> I plumbing, and electrical subcontractors who will contract directly with the general contractor <br /> submitting the Bid to the City. <br /> IType/Scope of Work Name:and Address of Subcontractor/Or:Bidder <br /> HEATING <br /> I <br /> Subcontractor,bidder or"no work"MUST be K19- Lij -')j - <br /> stated <br /> VENTILATION AND AIR CONDITIONING ,�;�.� ` <br /> Subcontractor,bidder or"no work"MUST be �.J�f lf�"U'^1�.L• <br /> I <br /> stated <br /> PLUMBING(as described in RCW Chap. 18.106) R� <br /> Subcontractor,bidder or"no work"MUST be iVV j,5 .(f • <br /> stated <br /> I ELECTRICAL(as described in RCW Chap. }P p <br /> 19.28) I. j6 1,V)A / '1L . <br /> Subcontractor, bidder or "no work" MUST be <br /> I <br /> stated <br /> I <br /> I <br /> 1 <br /> 1 <br /> I SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No. -UP3470-E O Division P-PROPOSAL April 2016 <br /> SP-19 <br /> rovided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.