My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> IDIVISION D - BID ITEM DESCRIPTIONS <br /> 1 CITY OF EVERETT,WASHINGTON <br /> BID ITEMS FOR <br /> ISEWER SYSTEM REPLACEMENT ANDCAPACITY IMPROVEMENTS <br /> SEWER "M" PHASE II <br /> IWO No. - UP3470-10 <br /> A-1 & B-1: Surveying SP-31 <br /> 1 A-2 & B-2: Contractor's Liaison SP-31 <br /> A-3 & B-3: Mobilization SP-32 <br /> A-4 & B-4: Traffic Control Labor SP-32 <br /> I A-5 & B-5: Maintenance and Protection of Traffic Control SP-33 <br /> A-6 & B-6: Temporary Sedimentation and Erosion Control SP-33 <br /> A-7 & B-7: Street Cleaning and Sweeping SP-33 <br /> A-8 & B-8: Sawcutting Pavement, Final Joint Cut, Up to 6-inch Thickness SP-34 <br /> I A-9 & B-9: Sawcutting Pavement, Final Joint Cut,Additional 1-inch Thickness SP-34 <br /> A-10 & B-10: Grinding/Planing Bituminous Pavement SP-35 <br /> A-11 & B-11: Trench Excavation Safety Systems SP-35 <br /> I A-12 & B-12: Roadway Excavation Including Haul SP-35 <br /> A-13: Construction Geotextile SP-36 <br /> A-14: Foundation Material SP-36 <br /> 1 A-15 & B-13: Roadway Asphalt Treated Base (ATB) SP-36 <br /> A-16 & B-14: Crushed Surfacing Top Course (CSTC) SP-37 <br /> A-17 & B-15: Crushed Surfacing Base Course (CSBC) SP-37 <br /> I A-18 & B-16: Gravel Borrow Including Haul SP-38 <br /> A-19 & B-17: Cement Concrete under Asphalt Pavement SP-38 <br /> A-20 & B-18: Temporary Pavement Patch SP-39 <br /> I A-21 & B-19: Hot Mix Asphalt (HMA), Class B / HMA Y2" PG SP-39 <br /> A-22 & B-20: Cement Concrete Pavement SP-40 <br /> B-21: Storm Drain Pipe, 8 In. Dia SP-40 <br /> B-22: Storm Drain Pipe, 12 In. Dia SP-40 <br /> I B-23: Storm Drain Pipe, 15 In. Dia SP-40 <br /> B-24: Storm Drain Pipe, 18 In. Dia SP-40 <br /> B-25: Storm Drain Pipe, 21 In. Dia SP-40 <br /> I B-26: Storm Drain Pipe, 24 In. Dia SP-40 <br /> B-27: Inlet SP-41 <br /> B-28: Catch Basin, Type A SP-41 <br /> 1 B-29: Catch Basin, Type B SP-41 <br /> B-30: Catch Basin, Type 2, 48 In. Dia. SP-41 <br /> B-31: Catch Basin, Type 2, 54 In. Dia. SP-41 <br /> I B-32: Catch Basin Additional Height 48 In. Dia. Type 2 SP-42 <br /> A-23: Manhole, 48-inch Dia. Type 1 SP-42 <br /> B-33: Manhole, 48-inch Dia. Type 3 SP-42 <br /> I A-24: Manhole, 54-inch Dia. Type 1 SP-42 <br /> B-34: Manhole, 54-inch Dia. Type 3 SP-42 <br /> A-25: Manhole, 60-inch Dia. Type 1 SP-42 <br /> A-26: Manhole, 72-inch Dia. Type 3 SP-42 <br /> 1 <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PHASE II <br /> I WO No.- UP3470-10 Division D- BID ITEM DESCRIPTIONS April 2016 <br /> SP -29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.