My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ICITY OF EVERETT, WASHINGTON <br /> ISPECIFICATIONS FOR <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS <br /> 1 SEWER "M" PHASE II <br /> W.O. # UP 347040 <br /> ITABLE OF CONTENTS <br /> INOTICE TO CONTRACTORS SP-1 <br /> DIVISION P — PROPOSAL SP-3 <br /> PROPOSAL SP-3 <br /> I SUBCONTRACTORS FORM SP-19 <br /> DISADVANTAGED/WOMEN'S BUSINESS ENTERPRISE SP-21 <br /> NON-COLLUSION AFFIDAVIT SP-23 <br /> I BID DEPOSIT SP-25 <br /> DIVISION D — BID DESCRIPTIONS SP-29 <br /> DIVISION C — CONTRACT SP-51 <br /> I CONTRACT SP-51 <br /> PAYMENT BOND SP-55 <br /> PERFORMANCE BOND SP-57 <br /> I DIVISION 1 — GENERAL REQUIREMENTS SP-59 <br /> General Description and Location of Project (******) SP-59 <br /> Design Engineer (******) SP-59 <br /> I Standard Specifications (******) SP-59 <br /> 1-01 DEFINITIONS AND TERMS SP-60 <br /> 1-02 BID PROCEDURES AND CONDITIONS SP-64 <br /> I 1-03 AWARD AND EXECUTION OF CONTRACT SP-69 <br /> 1-04 SCOPE OF THE WORK SP-71 <br /> 1-05 CONTROL OF WORK SP-77 <br /> 1-06 CONTROL OF MATERIAL SP-93 <br /> 111 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC SP-95 <br /> 1-08 PROSECUTION AND PROGRESS SP-112 <br /> 1-09 MEASUREMENT AND PAYMENT SP-131 <br /> I 1-10 TEMPORARY TRAFFIC CONTROL SP-151 <br /> 1-11 MISCELLANEOUS (******) SP-154 <br /> DIVISION 2 — EARTHWORK SP-157 <br /> I 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP SP-157 <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS SP-157 <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT SP-160 <br /> I 2-04 HAUL SP-162 <br /> 2-07 WATERING SP-162 <br /> 2-08 STREET CLEANING SP-163 <br /> I 2-09 STRUCTURE EXCAVATION SP-163 <br /> 2-11 TRIMMING AND CLEANUP SP-165 <br /> ISEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER"M" PHASE II <br /> WO No. — UP3470-10 TABLE OF CONTENTS April 2016 <br /> 111 <br /> SP -v <br />
The URL can be used to link to this page
Your browser does not support the video tag.