Laserfiche WebLink
I <br /> CITY OF EVERETT,WASHINGTON <br /> ICONTRACT <br /> THIS CONTRACT is made and entered into this a5 day of (\4 '' , 201 , by and between <br /> I the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br /> Washington, hereinafter called the "City," and <br /> KLB Co S7{Zve-( r-. ZryCa <br /> IWNSokoC�o� Cot:PoRP.morJ , hereinafter called the "Contractor." <br /> In con`sideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br /> I furnish all labor, tools, materials, equipment, and supplies required to build and construct and to build <br /> and construct in a workmanlike manner the work, improvements, and appurtenances in accordance with <br /> the Specifications and Plans entitled: "SEWER SYSTEM REPLACEMENT AND CAPACITY <br /> ' IMPROVEMENT SEWER"M" PROJECT ("Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> reference and are hereby made a part of this Contract: <br /> IA. Notice to Contractors <br /> 1 B. Instructions to Bidders (if any) <br /> C. Washington State Department of Transportation Standard Specifications 2014 as <br /> I <br /> modified by all amendments thereto as of the date of bid opening of this Project <br /> ("Standard Specifications"). <br /> D. Special Provisions <br /> 1 E. Plans, Drawings and Project Specifications <br /> IF. Addenda(if any) <br /> G. Payment Bond and Performance Bond <br /> IH. Contractor's Proposal/Bid(conformed copy dated 05/03 4)0 k6 ) <br /> I. All provisions required by law whether set forth and reproduced herein or not <br /> 1 2. Time for Completion. Substantial completion shall be achieved within two hundred and sixty (220) <br /> working days of the effective date of the Notice to Proceed. Physical completion shall be within twenty <br /> I (20)working days of the actual date of issuance of substantial completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional <br /> expense in the event that the Contractor does not complete the work in all respects and have it ready for <br /> I use by the substantial completion date stated. Because it is difficult to accurately compute the amount of <br /> such costs and damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br /> damages as computed in Section 1-08.9 of the Standard Specifications, for each and every working day <br /> I required to accomplish substantial completion of the work in excess of the period established above for <br /> substantial completion. For overruns in contract time occurring after the physical completion date, <br /> liquidated damages shall be assessed at the rate of ten percent (10%) of the amount computed in Section <br /> I 1-08.9 of the Standard Specifications until the work is physically complete. <br /> 4. Contract Amount. The amount of this Contract is <br /> ($ H,14-74 613 ,5) ) and is based on the proposal/bid submitted by Contractor dated <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PROJECT PHASE II <br /> 1 WO No. - UP3470-10 Division C - CONTRACT April 2016 <br /> SP -51 <br />