My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction 6/22/2016
>
Contracts
>
Capital Contract
>
KLB Construction 6/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2017 10:42:19 AM
Creation date
7/13/2016 11:44:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction
Approval Date
6/22/2016
Council Approval Date
5/25/2016
Department
Public Works
Department Project Manager
David Voigt
Subject / Project Title
Sewer M Project Phase 2
Public Works WO Number
UP 3470
Tracking Number
0000165
Total Compensation
$4,474,693.51
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB Construction Inc. 7/17/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> such insurance shall be a material breach of the Contract. City shall be entitled to damages for such a <br /> ' breach that include, but are not limited to, any loss (including, but not limited to, third party litigation <br /> expenses and professional fees) suffered by the City if the City is determined to be solely or <br /> concurrently negligent, and if the City suffers any loss or must pay or defend against any such claim, <br /> ' suit, demand or damage as a result of such breach. <br /> 9. Waiver of Industrial Insurance Immunity. Contractor waives any right of contribution against the <br /> City. It is agreed and mutually negotiated that in any and all claims agcinst he City, its agents or <br /> ' employees, the Contractor, a subcontractor, anyone directly or indirectly employed by the Contractor or <br /> subcontractor, or anyone for whose acts any of them may be liable, the defense and indemnification <br /> obligations hereunder shall not be limited in any way by any limitation on the amount of damages, <br /> ' compensation, or benefits payable by or for the Contractor or any subcontractor under industrial <br /> worker's compensation acts, disability benefit acts, or other employees' benefit acts. Contractor's and <br /> City's signatures hereto indicate specific waiver of Contractor's industrial insurance immunity in order <br /> ' to fulfill this indemnity. Solely for the purpose of indemnification and defense as provided in this <br /> Contract, the Contractor specifically waives any immunity under the State Industrial Insurance Law, <br /> Title 51 RCW. The Contractor expressly acknowledges that this waiver of immunity under Title 51 <br /> RCW was the subject of mutual negotiation and was specifically entered into pursuant to the provisions <br /> of RCW 4.24.115. <br /> 10. Repair of Damage. The Contractor agrees to repair and replace all property of the City and all <br /> ' property of others damaged by it, its employees, subcontractors, suppliers and agents. <br /> 11. Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work under this <br /> contract is to be done at the Contractor's risk and that: (1) prior to submitting its proposal or bid, it <br /> ' became familiar with the conditions of excavation, subsurface, backfill, materials, climatic conditions, <br /> location, traffic, and other contingencies that may affect the work and has made its bid or proposal <br /> accordingly and (2) that it assumes the responsibility and risk of all loss or damage to materials or work <br /> which may arise from any cause whatsoever prior to completion. <br /> 12. Headings for Convenience Only. The headings in this document are for convenience only, and <br /> shall not be used or considered to interpret or construe this document. <br /> 13. Effective Date. This Contract is effective as of the date of the last person to sign it, and may be <br /> executed in multiple counterparts, each of which shall be deemed an original. <br /> 1 <br /> 1 <br /> I <br /> I <br /> I <br /> SEWER SYSTEM REPLACEMENT AND CAPACITY IMPROVEMENTS SEWER "M" PROJECT PHASE II <br /> ' WO No. - UP3470-10 Division C - CONTRACT April 2016 <br /> SP -53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.