My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 7002
>
Resolutions
>
Resolution 7002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 10:34:42 AM
Creation date
7/15/2016 10:34:22 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
7002
Date
6/29/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OP=ii <br /> RESOLUTION NO. 7002 El/E-J - <br /> A RESOLUTION adopting the Annual Transportation Improvement <br /> Program (TIP) update for 2017 to 2022. <br /> WHEREAS, RCW 35.77.010 requires that the legislative body of each city and town <br /> shall prepare and adopt a"Comprehensive Transportation Program" for the ensuing six <br /> calendar years to serve as a guide in carrying out a coordinated transportation facility <br /> construction program, and that said legislative body shall annually thereafter review, <br /> amend as necessary, and readopt said Comprehensive Transportation Program; and <br /> WHEREAS, in compliance with RCW 35.77.010 there exists such a Comprehensive <br /> Transportation Program (known as the Six-year Transportation Improvement Program or <br /> TIP) for the City of Everett that identifies various types of transportation improvements <br /> needed, and estimated costs; and <br /> WHEREAS, The City Council of the City of Everett has reviewed the work <br /> accomplished under said program, determined current and future City transportation <br /> needs, and based on these findings has prepared a Six-year Transportation Improvement <br /> Program for the next six years; and <br /> WHEREAS, Everett's Transportation Advisory Committee and Planning Commission <br /> have reviewed and recommended approval of this update; and <br /> WHEREAS, the adoption of the update to the City of Everett Transportation <br /> Improvement Program enables the City to apply for and receive various state and federal <br /> funds to implement the projects in the program; and <br /> WHEREAS, after due notice, a hearing on the proposed program was held by the City <br /> Council in accordance with RCW 35.77.010; and <br /> WHEREAS, the proposed program is consistent with, and implements the City of Everett <br /> Comprehensive Plan; <br /> NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY <br /> OF EVERETT that the 2017-2022 annual update of the Six-year Transportation <br /> Improvement Program, a copy of which is attached hereto as Exhibit A and incorporated <br /> herein as if fully set forth, is adopted and the City Engineer is directed to file a copy of <br /> this program with the Washington State Secretary of Transportation pursuant to RCW <br /> 35.77.010 and pursue funding for the projects cit;. in the pre tr./ herever available. <br /> I <br /> Co I it Memb- I troduc ng Resolution <br /> PASSED and APPROVED this 29th day of June, 201 <br /> , / <br /> L. _/. /_///I/AA <br /> Cou it President 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.