|
CITY OF EVERETT 2017 TO 2022 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> Project PROJECT 4f- PROJECT NAME PE R/W CONST. Est.2015-20 LEAD MAP
<br /> Number TYPE START START START Expenditures AGENCY NO.
<br /> 42 Local Access-SAF 1 BNSF RR safety improvements Jan.17 Jun.16 $600,000 • EVERETT
<br /> 43 Local Access-SAF 2 Local Roadway Safely Projects Jan.17 Jun.16 $120,000 • EVERETT
<br /> 44 Local Access-SAF 3 Safe Routes to Schools Jan.17 Apr.16 $600,000 ' EVERETT
<br /> 45 Local Access-PR/10 1 Bridge Rehabilitation Program Jan.17 Jul.16 $3,000,000 ' EVERETT
<br /> 46 Local Access-PR/M 2 Annual Street Overlay Program Jan.17 Jul.16 $6,000,000 ` EVERETT
<br /> 47 Local Access-PR/M 3 Sidewalk repair and replacement Jan.17 May 16 $360,000 ' EVERETT
<br /> 48 Local Access-PR/M 4 Pavement Marking Project Jan.17 May 16 $210,000 ' EVERETT
<br /> 49 Local Access-STR 1 106th Place SE Improvements Nov.10 Jun.16 $650,000 ' EVERETT 34
<br /> 50 Local Access-STR 2 3rd Avenue SE Street Improvements Jan.17 Apr.16 $675,000 • EVERETT 35
<br /> 51 Local Access-STR 3 Local Street Improvements Jul.17 May 16 $580,000 • EVERETT
<br /> 52 Local Access-STR 4 Upper&Lower Ridge Rd.Str.Improv. Aug.17 Jun.16 $300,000 • EVERETT 36
<br /> 53 Local Access-STR 5 Simpson Site Access Improvements Aug.17 Jun.16 $2,000,000 • EVERETT 37
<br /> 54 Local Access-STR 6 Downtown Streetscape Improvements Jul.14 Jan.15 Apr.16 $8,000,000' EVERETT 38
<br /> 55 Local Access-SIG 1 Traffic Signal Central Controller Replacement Jan.17 Jul.15 $600,000 • EVERETT
<br /> 56 Local Access-SIG 2 Traffic Signal Interconnect Jan.17 May.15 $240,000 • EVERETT
<br /> 57 Local Access-SIG 3 Traffic Signal Improvements Jan.17 Jun.15 $900,000 • EVERETT
<br /> 58 Local Access-SIG 4 Traffic Sign Improvements Jan.17 Jun.15 $500,000 • EVERETT
<br /> 59 Local Access-NEI 1 Neighborhood Block Grants Jan.17 May.15 $360,000 • EVERETT
<br /> 60 Local Access-NEI 2 Neighb.Traffic Mitigation Studies&Projects Jan.17 May.15 $2,400,000 ' EVERETT
<br /> 61 Local Access-NEI 3 Residential Sidewalks Jan.17 May.15 $2,400,000 ' EVERETT
<br /> 64 Local Access-NM 1 36th Street/BNSF Rail Line Ped/Bike Crossing Jan.08 Nov.16 Jun.18 $2,800,000 • EVERETT 39
<br /> 65 Local Access-NM 2 Smith Island Bike/Ped improvements Jan.10 Jan.16 May 18 $1,000,000 • EVERETT 40
<br /> 66 Local Access-NM 3 Bicyle Master Plan Implementation Jan.16 Jan.16 $200,000 ' EVERETT
<br /> 67 Local Access-NM 4 Riverside Business Park Ped trail Apr.09 Apr.16 $700,000 ' EVERETT 41
<br /> 68 Local Access-NM 5 West/East Marine View Drive Bike-Ped Improvements Aug.09 Apr.16 $500,000 • EVERETT 42
<br /> 69 Local Access-NM 6 47th Street Pedestrian Improvements Jan.17 Jun.16 $500,000 • EVERETT 43
<br /> 70 Local Access-NM 7 Pigeon Creek No.1/BNSF Crossing Jan.10 Jul.16 Jan.17 $925,000 • EVERETT 44
<br /> 71 Local Access-NM 8 Henry Jackson Park Ped Bridge Jan.07 May.16 Jul.20 $2,700,000 ' EVERETT 45
<br /> 72 Local Access-NM 9 Grand Ave./N.Marina Ped-Bike Connection Jan.15 Jan.16 May.17 $1,050,000 • EVERETT
<br /> 73 Local Access-NM 10 Shoreline Access Improvements Apr.15 Jan.16 $2,400,000 ' EVERETT
<br /> 74 Local Access-NM 11 Snohomish River Bike and Ped.Bridge Nov.01 Jan.16 $9,000,000 • EVERETT 46
<br /> 75 Local Access-NM 12 Pigeon Creek Road No.1 Improvements Apr.17 Jan.18 $1,000,000 ' EVERETT 47
<br /> 76 Local Access-NM 13 Lowell Snohomish River Rd.Bike/Ped Connection May.15 Aug.16 Jan.17 $1,500,000 • EVERETT 48
<br /> 77 Local Access-NM 14 Everett Non-Motorized Projects May.15 Aug.16 Jan.17 $760,000 • EVERETT
<br /> 78 Local Access-NM 15 Riverfront District Bike/Ped Paths Jul.09 Jan.16 $500,000 • EVERETT
<br /> 79 Local Access-NM 16 Interurban Trail Bike/Ped Path Improvements Jul.10 Jan.16 $500,000' EVERETT
<br /> 80 Local Access-NM 17 Bicyle Detection Signals Jan.16 Jan.17 $200,000' EVERETT
<br /> 81 Local Access-NM 18 ADA Signals Jan.16 Jan.17 $200,000* EVERETT
<br /> 82 Local Access-NM 19 ADA Ramps Jan.16 Jan.17 $200,000' EVERETT
<br /> $57,130,000
<br /> NOTE: Projects shown in bold type(if any)were not included in the 2016-2020 Six-year TIP.
<br /> •A portion or all of the funding for this project has not yet been committed.
<br /> Codes: SAF=Safety; PR/M=Preservation and Maintenance; STR=Street construction; SIG=Traffic Signal Improvement;
<br /> NEI=Neighborhood Projects; LS=Landscaping Project; NM=Non-Motorized Improvement
<br />
|