Laserfiche WebLink
1 a PVEFNTl CITYCOUNCIL a GP,NDA ITEM COVER <br /> SHEET <br /> 3 <br /> ti 1 <br /> PROJECT TITLE: <br /> An �6!to-VI 1 <br /> Ordinance creating the Consent COUNCIL BILL <br /> special construction fiend Action Originating Department Facilities <br /> entitled"Main Library— 4/20/16 First Reading Contact Person Chris Lark <br /> Window Replacement", Second Reading Phone Number 425-257-8846 <br /> Fund 342, Program 019, Third Reading FOR AGENDA OF April 20, 2016 <br /> authorizing the design and Public Hearing <br /> construction to replace the Initialed by: <br /> existing wood windows • Department Head <br /> CAA <br /> Council President <br /> Location Preceding,Action Attachments Department(s) A proval <br /> .2702 Hoyt Avenue None Ordinance Facilities, Library <br /> Amount Budgeted $325,000.00. <br /> Expenditure Required -0- Account Number(s): • <br /> Budget Remaining -0- Fund 342, Program 019 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The existing wood windows at the Main Library date back to its original construction in the 1934. Time and <br /> the elements have taken their toll on the windows and they have rotted CO to the point that water is <br /> infiltrating the building and damaging,the existing plaster. This project is intended to replace all existing <br /> wood windows. Since the Main Library is on the Washington Heritage Register but not listed on the <br /> National Register or Everett Register,a formal review process of the replacements is not required. Facilities <br /> Department will,however,present the window design to the Everett Historical Commission prior to <br /> engaging in the bid process. <br /> The estimated cost of the project is as follows: <br /> Design $ 24,000 <br /> Construction $ 300,000 <br /> Project Costs S 1,000 <br /> TOTAL 325,000 <br /> T., <br /> is,' ...floffun,,_s ; -:111 CIP 1. <br /> 7 <br />