My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/04/20 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/04/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2016 5:06:06 PM
Creation date
5/3/2016 5:05:25 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rTLPE T T CITY CO U�CL�GENDA ITEM COVER SHTE <br /> .01 _ <br /> 11 4 <br /> PROJECT TITLE: 1 CFN V f <br /> An Ordinance closing a special BriefingBIT l_ ``C--ig <br /> improvement project entitled Proposed Action Originating Department Public Works <br /> "Pedestrian Signals at Casino Consent Contact Person Ryan Sass <br /> Road and Rucker Avenue," Action Phone Number (425)257-8942 <br /> Fund 303, Program 086, as First Reading FOR AGENDA OF April 20, 2016 <br /> established by Ordinance No. Second Reading <br /> 3160-09 Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President , <br /> . 7 <br /> Location Preceding Action Attachments Department(s)A u proval <br /> Casino Road and Rucker Ordinance No. 3160-09 Proposed Ordinance Public Works <br /> Avenue <br /> Amount Budgeted $ 540,000 <br /> Expenditure Required $ 539,999 Account Number(s): PW 3 4405 <br /> Budget Remaining $ <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> This project provided for the design and construction of two pedestrian traffic signals to improve the safety <br /> of transit riders crossing two high-volume arterial streets. One signal enhanced what was only a striped <br /> crosswalk across Casino Road, adjacent to the Swift Bus Rapid Transit (BRT) station on Evergreen Way. <br /> The second signal was installed midblock on Rucker Avenue, adjacent to the Swift BRT station at the <br /> Everett Clinic. In addition to the two traffic signals,the project also constructed curb bulb-outs, Americans <br /> with Disability Act compliant curb ramps, and minor drainage work. <br /> Total costs include design and construction of$442,374 and remaining balance transfer to Fund 119 of <br /> S97,125 for a total of$539,999. <br /> The finding sources for the project were: <br /> State Grant—HLP-PB09(000) S 399,999 <br /> Fund 119—Street Improvements 140.000 <br /> Total Funds $ 539,999 <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.