Laserfiche WebLink
EVEP TT CITY COUNCIL AGENDA ITEM COVER ST—MET II 5 <br /> LI ' <br /> PROJECT TITLE: (_ <br /> An Ordinance closing a special Briefing COUNCIL BILL= ��e4-' <br /> improvement project entitled, Proposed Action Originating Department Public Works <br /> "Evergreen Way and Pecks Consent Contact Person Ryan Sass <br /> Drive-Intersection Sarety," Action ' Phone Number (425) 257-8942 <br /> Fund 303, Program 099, as First Reading FOR AGENDA OF April 20, 2016 <br /> S' <br /> established by Ordinance No. Second Reading <br /> 3321-i 3 Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) A)proval <br /> Evergreen Way and Final Acceptance: Proposed Ordinance Public Works <br /> Pecks Drive October 22,2014 <br /> Amount Budgeted $411,000 <br /> Expenditure Required $268,209 Account Number(s): PW 3544 <br /> • <br /> Budget Remaining $142,791 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> This project constructed pedestrian and traffic signal safety improvements at the intersection of Evergreen <br /> Way and Pecks Drive. These improvements included left turn arrows, new traffic signal poles,traffic signal <br /> backplate visibility improvements, accessible pedestrian signals, street lighting improvements,pavement <br /> marking improvements, and Americans with Disability Act compliant curb ramps. <br /> The project cost was significantly under the engineer's estimate due to utilizing existing conduits where <br /> available which avoided cutting and restoration expenses. <br /> The funding source for this project was: <br /> Federal Grant–Highway Safety Improvements (HSIP) $ 268,209 <br /> • <br /> i_ ,_ . �_ �T 1}:_._TI'1i'• ( _t ct c] .- iLS si_ of Ccun':i : <br /> ...i -� -L.: ;ILi'_ - <br /> 15 <br />