Laserfiche WebLink
Findings & Conclusions <br /> 3/1/02 <br /> Page 15 <br /> • <br /> and Proposals" (Department of Ecology Publication #94-29) and should be <br /> reviewed by the SSOTAC. Applicants should consider the overall restoration <br /> objectives set forth in Chapter 6. <br /> 11 —Performance Criteria. Standards and performance criteria shall be <br /> established for each mitigation action as described in Section 5.6 and stated in the <br /> CMMP. <br /> 12—Monitoring Requirements. Each compensation site shall be monitored <br /> over a period of up to10 years as described in Section 5.6. <br /> 13—Threatened,Endangered,or Commercially Important Species. All tidal <br /> and associated riparian areas within the SEWIP planning area are designated <br /> critical habitat for chinook salmon and are likely to also constitute important <br /> habitat for coho salmon and anadromous native char. If areas in the UGA have <br /> other threatened, endangered or commercially important species, then the <br /> compensation plan shall incorporate design measures to mitigate any impacts to <br /> these species and their habitats. <br /> 14—Use of Restoration Acreage in Lieu of Maintenance and Contingency <br /> Bond. The restoration of additional habitat acreage may be used in lieu of a <br /> maintenance and contingency bond. The area of this in-kind maintenance and <br /> contingency bond shall be at least equal to one-half the area required for <br /> compensation (1 additional acre of restoration for every 2 acres needed as <br /> compensation). Habitats that are restored/enhanced for the maintenance and <br /> contingency bond may be used or sold by the applicant to compensate for other <br /> impacts when all the 5-year performance standards established in the mitigation <br /> plan are met. Separate bonds may be required for monitoring. <br /> 15—Projects with Impacts Outside of the Estuary Study Area. Projects with <br /> impacts outside of the SEWIP study area may be compensated for within the <br /> SEWIP study area, consistent with the SEWIP restoration and/or enhancement <br /> goals and objectives. <br /> 16—Loss of Palustine Wetlands. Compensation is required where existing <br /> palustrine wetlands will be converted to tidal habitat for compensatory mitigation. <br /> The acreages calculated per this regulation are set aside within the restored <br /> mitigation site and may not be considered as compensatory mitigation. However, <br /> to provide an incentive to developers to undertake tidal restoration as <br /> compensatory mitigation, while recognizing the range of functions provided by <br /> different types of isolated palustrine wetlands, the following ratios shall apply for <br /> wetlands, based on existing scores from the SEWIP freshwater model (Figure <br />