Laserfiche WebLink
9.8 ACCESS CHANNELS ON BASIC SERVICE 32 <br /> 9.9 ACCESS CHANNEL ASSIGNMENTS 33 <br /> 9.10 RELOCATION OF ACCESS CHANNELS 33 <br /> 9.11 INTERCONNECTIONS 33 <br /> 9.12 RETURN LINES 33 <br /> 9.13 REPAIR AND REPLACEMENT 33 <br /> SECTION 10. INSTITUTIONAL NETWORK AND COMPLIMENTARY <br /> CABLE INTERNET SERVICE 33 <br /> 10.1 INSTITUTIONAL NETWORK 34 <br /> 10.2 COMPLIMENTARY CABLE INTERNET SERVICE 34 <br /> SECTION 11. GENERAL RIGHT-OF-WAY USE AND CONSTRUCTION 34 <br /> 11.1 RIGHT TO CONSTRUCT 34 <br /> 11.2 RIGHT-OF-WAY MEETINGS 34 <br /> 11.3 JOINT TRENCHING/BORING 34 <br /> 11.4 GENERAL STANDARDS 34 <br /> 11.5 PERMITS REQUIRED FOR CONSTRUCTION 35 <br /> 11.6 EMERGENCY PERMITS 35 <br /> 11.7 MOVEMENT OF FACILITIES DURING EMERGENCIES 36 <br /> 11.8 COMPLIANCE WITH APPLICABLE CODES 36 <br /> (A) City Construction Codes. 36 <br /> (B) Tower Specifications. 36 <br /> (C) Safety Codes 36 <br /> 11.9 MINIMAL INTERFERENCE 36 <br /> 11.10 PREVENT INJURY/SAFETY 37 <br /> 11.11 ONE CALL 37 <br /> 11.12 NOTICE REGARDING RIGHT-OF-WAY 37 <br /> 11.13 UNDERGROUND CONSTRUCTION AND USE OF POLES 37 <br /> 11.14 REPAIR AND RESTORATION OF PROPERTY 38 <br /> 11.15 DISCONTINUING USE 38 <br /> 11.16 RELOCATION OR REMOVAL 39 <br /> 11.17 MOVEMENT OF CABLE SYSTEM FACILITIES FOR OTHER FRANCHISE OR PERMIT <br /> HOLDERS 39 <br /> 11.18 TEMPORARY CHANGES FOR OTHER PERMITEES 39 <br /> 11.19 RESERVATION OF CITY USE OF RIGHT-OF-WAY 40 <br /> 11.20 TREE TRIMMING 40 <br /> 11.21 INSPECTION OF CONSTRUCTION AND FACILITIES 40 <br /> 11.22 STOP WORK 40 <br /> 11.23 WORK OF CONTRACTORS AND SUBCONTRACTORS 41 <br /> SECTION 12. ADDITIONAL FACILITIES 41 <br /> 12.1 ADDITIONAL DUCTS AND CONDUITS 41 <br /> 12.2 INCREMENTAL AND FULLY ALLOCATED COSTS 42 <br /> 12.3 NOTIFICATION 42 <br /> Page 4 of 58 <br />