My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ICITY OF EVERETT,WASHINGTON <br /> CONTRACT <br /> ITHIS CONTRACT is made and entered into this aata"day of 1\44_ , 20115 by and between <br /> the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br /> I Washington, hereinafter called the "City," and <br /> A- LP�9 SC- Pit 6 l ►� SONS/Rv G ci,�r� C , a <br /> WAS N iar,-36 �og.r Cto►-3 , hereinafter called tSNhe "Contractor." <br /> I In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br /> furnish all labor, tools, materials, equipment, and supplies required to build and construct and to build and <br /> construct in a workmanlike manner the work, improvements, and appurtenances in accordance with the <br /> ISpecifications and Plans entitled: "Riverfront Development—North Wetland Complex", (the "Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> reference and are hereby made a part of this Contract: <br /> IA. Notice to Contractors <br /> IB. Instructions to Bidders (if any) <br /> C. Washington State Department of Transportation Standard Specifications 2016 as modified <br /> I by all amendments thereto as of the date of bid opening of this Project ("Standard <br /> Specifications"). <br /> D. Special Provisions <br /> IE. Plans, Drawings and Project Specifications <br /> IF. Addenda(if any) <br /> G. Performance Bond and Payment Bond <br /> IH. Contractor's Proposal/Bid(conformed copy dated 5- 1-1 - 01 6 ) <br /> I. All provisions required by law whether set forth and reproduced herein or not <br /> I2. Time for Completion. Substantial completion shall be achieved within sixty'(60)working days of the <br /> effective date of the Notice to Proceed. Physical completion shall be within ten (10) working days of the <br /> gactual date of issuance of substantial completion. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional expense <br /> in the event that the Contractor does not complete the work in all respects and have it ready for use by the <br /> I substantial completion date stated. Because it is difficult to accurately compute the amount of such costs <br /> and damages, the Contractor hereby covenants and agrees to pay to the City liquidated damages as <br /> computed in Section 1-08.9 of the Standard Specifications, for each and every working day required to <br /> I accomplish substantial completion of the work in excess of the period established above for substantial <br /> completion. For overruns in contract time occurring after the physical completion date, liquidated <br /> damages shall be assessed at the rate of ten percent (10%) of the amount computed in Section 1-08.9 of <br /> Ithe Standard Specifications until the work is physically complete. <br /> I <br /> Project Title Division C Month 2013 <br /> IWork Order# Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.