Laserfiche WebLink
I <br /> BMP 4. DISPOSAL OF PILING, SEDIMENT AND CONSTRUCTION RESIDUE <br /> A. Piles shall be cut into lengths as required by the disposal company. 1 <br /> B. Cut up piling, sediments, absorbent pads/boom, construction residue and plastic sheeting <br /> from containment basin shall be packed into container. For disposal, ship to an approved <br /> Subtitle D Landfill. <br /> C. Creosote-treated materials shall not be re-used. I <br /> BMP 5. RESUSPENSION/TURBIDITY <br /> A. Crane operator shall be trained to remove pile from sediment slowly. <br /> B. Work shall be done in low water and low current, to the extent possible. <br /> C. Removed piles shall be placed in a containment facility. I <br /> D. Sediments spilled on work surfaces shall be contained and disposed of with the pile debris at <br /> permitted upland disposal site. 1 <br /> E. Holes remaining after piling removal shall not be filled. <br /> I <br /> a <br /> I <br /> I <br /> I <br /> 4 Updated 3/19/2013 <br />