My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 July 26, 2012 <br /> HWA Project No. 2007-087-21 <br /> I <br /> 1 7.5 SHEET PILE WALL DESIGN 21 <br /> 7.6 RESTROOM STRUCTURE FOUNDATIONS 24 <br /> 7.7 LOW RETAINING WALLS AND CONCRETE PLAZA 24 <br /> I7.8 FLOATING DOCK AND DOLPHIN SUPPORT RECOMMENDATIONS 25 <br /> 7.9 EMBANKMENT CONSTRUCTION AND STABILIZATION 25 <br /> I 7.9.1 Embankment Construction 25 <br /> 7.9.2 Structural Fill and Soil Compaction 26 <br /> 7.9.3 River Bank Stabilization 26 <br /> I 7.10 RAILROAD CORRIDOR TRAIL IMPROVEMENTS 28 <br /> 7.10.1 Trail Settlement Estimates 28 <br /> 7.10.2 Staged Construction for Railroad Corridor Trail 28 <br /> 1 7.10.3 Impacts to Storm Drains and Sanitary Sewer Force Main 29 <br /> 7.10.4 Impacts to the CSO Outfall Pipe 29 <br /> 1 7.11 NORTH WETLAND COMPLEX CHANNEL IMPROVEMENTS 30 <br /> 7.11.1 Channel Slope Stability 30 <br /> 7.11.2 Channel Grading 30 <br /> I 8. PAVEMENT RECOMMENDATIONS 32 <br /> 8.1 TRAIL PAVEMENT 32 <br /> 8.1.1 Design Traffic 32 <br /> 1 8.1.2 New Hot-Mix Asphalt (HMA)Pavement Design 33 <br /> 8.1.3 New Portland Cement Concrete (PCC) Pavement Design 33 <br /> I 8.2 PARKING LOT PAVEMENT 34 <br /> 8.3 ENTRANCE TO LIFT STATION#33 35 <br /> 8.4 SUBGRADE PREPARATION 35 <br /> I8.5 DRAINAGE 35 <br /> 9. CONDITIONS AND LIMITATIONS 36 <br /> 10. LIST OF REFERENCES 38 <br /> I <br /> LIST OF FIGURES(FOLLOWING TEXT) <br /> IFigure 1 Vicinity Map <br /> Figures 2A -2C Site and Exploration Plan <br /> I Figure 3 Cross Section B-B' <br /> Figure 4 Cross-Section A-A' — Slope Stability—Nisqually Earthquake Event for <br /> Verification of Soil Parameters <br /> I Figure 5 Cross-Section C-C' — Slope Stability—Nisqually Earthquake Event for <br /> Verification of Soil Parameters <br /> Figure 6 Cross-Section D-D' — Slope Stability—Nisqually Earthquake Event for <br /> I Figure 7 Verification of Soil Parameters <br /> Cross-Section A-A' — Slope Stability— Static Case with Proposed Fill <br /> Figure 8 Cross-Section A-A' — Slope Stability—Seismic Case with Proposed Fill <br /> I <br /> I2007-087 Public Amenities Final.doc ii HWA GEOSCIENCES INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.