Laserfiche WebLink
I <br /> 1 CONTENTS <br /> 2 <br /> 3 <br /> 4 <br /> I <br /> 5 INTRODUCTION 1 <br /> 6 AMENDMENTS TO THE STANDARD SPECIFICATIONS <br /> 1 7 Section 1-06, Control of Material 1 <br /> 8 Section 1-07, Legal Relations and Responsibilities to the Public 2 <br /> I <br /> 9 Section 1-08, Prosecution and Progress 2 <br /> 10 Section 5-02, Bituminous Surface Treatment 2 <br /> 11 Section 5-04, Hot Mix Asphalt 2 <br /> 12 Section 6-02, Concrete Structures 4 <br /> I <br /> 13 Section 6-14, Geosynthetic Retaining Walls 4 <br /> 14 Section 6-19, Shafts 5 <br /> 15 Section 8-01, Erosion Control and Water Pollution Control 5 <br /> 16 Section 8-10, Guide Posts 5 <br /> 17 Section 8-22, Pavement Marking 5 <br /> II18 Section 9-03, Aggregates 6 <br /> 19 Section 9-04, Joint and Crack Sealing Materials 6 <br /> 20 Section 9-07, Reinforcing Steel 7 <br /> 21 SPECIAL PROVISIONS <br /> I22 DIVISION 1 <br /> 23 GENERAL REQUIREMENTS <br /> I24 DESCRIPTION OF WORK 8 <br /> 25 1-01.3 Definitions 9 <br /> III26 1-02 BID PROCEDURES AND CONDITIONS 12 <br /> 27 1-02.1 Prequalification of Bidders 12 <br /> 28 1-02.4 Examination of Plans, Specifications, and Site of Work 13 <br /> 29 1-02.5 Proposal Forms 13 <br /> I 30 1-02.6 Preparation of Proposal 13 <br /> 31 1-02.7 Bid Deposit 14 <br /> 32 1-02.8 Non-collusion Declaration and Lobbying Certification 14 <br /> 33 1-02.9 Delivery of Proposals 14 <br /> 34 1-02.13 Irregular Proposals 14 <br /> I <br /> I <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX A <br />