My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping and Construction, Inc. 7/20/2016
>
Contracts
>
Capital Contract
>
A-1 Landscaping and Construction, Inc. 7/20/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:15 AM
Creation date
7/25/2016 11:25:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping and Construction, Inc.
Approval Date
7/20/2016
Council Approval Date
6/22/2016
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD-3312
Tracking Number
0000177
Total Compensation
$598,750.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> PAGE <br /> 1 1-09.11 Disputes and Claims 83 I <br /> 2 1-09.11A Remedies 86 <br /> 3 1-09.12 Audits 90 <br /> I <br /> 4 1-09.13 Claims Resolution 92 <br /> 5 1-09.14 Patents and Royalties 92 <br /> I <br /> 6 1-09.15 Miscellaneous 93 <br /> 7 1-10 TEMPORARY TRAFFIC CONTROL 95 <br /> I <br /> 8 1-10.2 Traffic Control Management 95 <br /> 9 1-10.3 Traffic Control Labor, Procedures and Devices 95 I 10 1-10.4 Measurement 97 <br /> 11 DIVISION 2 <br /> 12 EARTHWORKI <br /> 13 CLEARING, GRUBBING, AND ROADSIDE CLEANUP 99 <br /> 14 Selective Tree Removal 99 I <br /> 15 Disposal of Usable Material and Debris 99 <br /> 16 Construction Requirements 100 <br /> I <br /> 17 Roadside Cleanup 100 <br /> 18 Payment 100 <br /> I <br /> 19 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 100 <br /> 20 Construction Requirements 100 <br /> I <br /> 21 Measurement 102 <br /> 22 Payment 102 I 23 WATERING 103 <br /> 24 MEASUREMENT 103 I 25 Payment 103 <br /> 26 SPECIAL EXCAVATION 104 <br /> 27 Description 104 I <br /> 28 Construction Requirements 104 <br /> 29 Special Excavation Plan 104 <br /> I <br /> 30 Measurement 106 <br /> 31 Payment 106 <br /> I <br /> 32 DIVISION 8 <br /> 33 MISCELLANEOUS CONSTRUCTION <br /> I <br /> 34 EROSION CONTROL AND WATER POLLUTION CONTROL 107 <br /> 35 Construction Requirements 107 <br /> I <br /> RIVERFRONT DEVELOPMENT NORTH WETLAND COMPLEX D <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.