Laserfiche WebLink
2014 <br /> Budget Adjustments <br /> Tally Sheet <br /> Department Code Rev Exp FB <br /> GGR-16 Special Projects Re-approp-US 2 Route Development 115R 134,383 134,383 I <br /> The 2009 Washington State Legislature provided the WSDOT with$400,000 to conduct the US 2- <br /> Everett Port/Naval Station to SR 9 Corridor Planning Study. The total budget for the study is$800,000. <br /> The funding partnership for the study includes WSDOT,Snohomish County,and the City. The City is <br /> contributing up to$200,000 to fund the study. City Council authorized Everett's participation in this <br /> agreement on September 1,2010. <br /> The intent of the corridor plan is to identify a range of mobility improvements that can be implemented <br /> over the next 20 years,as funding becomes available.A prioritized list of low, medium,and high cost <br /> improvements will be produced. The recommended improvements and strategies will provide a long <br /> range vision for the corridor which can be implemented incrementally using a variety of federal,state,and <br /> local funding sources. The City share is being funded from CIP3,through Special Projects Fund 115. <br /> This re-appropriation carries forward the remaining budget of$134,383 to 2014. <br /> Increase beginning fund balance 115 3080000073 24,514 <br /> Increase transfers in 115 3970073002 109,869 <br /> Increase intergovernmental payments 115 5730000510 134,383 <br /> �..�.''�:t'�€:V:�-..,s:t±���..z....,,�... �k�,"x.. _. _ .sa<. .. :�-- ^+�a�. .�sit.�,s.�x.:h�wC� ... �y�.�"i�.nx.•.' �H,..t.,.. 'x�: �', ..u...:r' <br /> Department Code. Rev Exp FB <br /> GGR-17 Street Improvements Re-appropriation-Street Projects 119R 550,800 I 550,800 <br /> This re-appropriation carries forward the remaining 2013 budgeted Street Improvement funds to 2014 for <br /> street improvement projects. The source of these funds is an allocated share of the motor vehicle fuel tax <br /> from Washington State and a General Fund allocation. These funds are used for arterial street projects, <br /> sidewalk replacements,parking improvements,traffic accident repairs, non-motorized improvements, <br /> traffic signal projects and capital project grant matching funds. <br /> Increase beginning fund balance 119 3080000000 550,800 <br /> Increase contstruction budget 119 5612002953650 550,800 <br /> F .As'"t...' ��-�..��"'=^-�_�� �t��:°:'•��':°3Gta aK:.;r'�,'-"� 'VA <br /> Department Code Rev Exp FB <br /> GGR-18 Municipal Arts IRe-approp-EPAC Projects 112R 135,000 I 135,000 <br /> As of December 31,2013,the Everett Performing Arts Center fund balance was$139,300. This request <br /> re-appropriates$135,000 of the fund balance to provide funding for sound equipment, plaza lighting and <br /> programming costs of the plaza concert series and other events throughout the year. <br /> Increase beginning fund balance-EPAC 112 3080000000 135,000 <br /> Increase equipment budget-EPAC 112 5010000640 135,000 <br /> •. 'f-�, a*.: i .£:{'.�T"* .ef�`s.,.. .�"i:v�-.�.xi�, i'r.`�' '! C�1t:'bw? T`�C`•, {i :' u..:;. tZ41, ',, }.... .4,'. ., . <br /> ATTACHMENT A <br /> Tally 2014 3/18/2014 <br />