Laserfiche WebLink
INSPECTION REPORT <br />r/ r' <br /> Date 8-1-t 4 Permi : fn J 11-10F 013 <br /> ir <br /> Contractor: <br /> Owner: <br /> Site Address: -fq-2.—C10- -ZAV<Z_ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding El Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: iaSIP t—__eNrtzmc.t" EArC C,A%SE,__._ <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED El <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: . 5zovve qcLZ, iortn 1N-I 0 <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> E- <br /> a—Ai.q 2L.E w.z vutt-- o f r L L-E fi (--,'<- <br /> Inspector: ..........7 ✓....."/..=:::4..... ) Date: O — <br /> ( 1 <br /> EIR 10/06 DATABAR,INC. <br />