My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6101 ASSOCIATED BLVD ELECTRIC MIRROR 2016-07-26
>
Address Records
>
ASSOCIATED BLVD
>
6101
>
ELECTRIC MIRROR
>
6101 ASSOCIATED BLVD ELECTRIC MIRROR 2016-07-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 4:12:33 PM
Creation date
7/26/2016 4:12:16 PM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6101
Tenant Name
ELECTRIC MIRROR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dave Hansen <br /> From: Matt Fickel (Pinnacle Consulting Group, Inc.) [mfickel@pinnaclegrp.com] <br /> Sent: Monday, November 16, 2015 2:01 PM <br /> To: Brett Kinney; dave@hendersonenterprises.biz <br /> Subject: RE: drawing for the dust collector pad <br /> Attachments: Al-Shell 9-15 PINN.dwg; 4728 COLLECTOR PADS.pdf;_Certification_htm <br /> Here you go <br /> at the dust collector locations we installed #4 rebar at 12" on-center each way. The slab is 6" thick and has a <br /> compressive strength of 3000psi. <br /> Matt Fickel <br /> Project Manager <br /> Project Engineer <br /> The Pinnacle Consulting Group, Inc. <br /> Industrial Engineering and Facility Planning <br /> 114 Avenue C, Snohomish, WA 98290 <br /> Cell: (425) 330-8249 <br /> Main: (360) 563-6511 <br /> Direct: (360) 563-7427 <br /> Fax: (360) 563-1041 <br /> www.pinnaclegrp.com <br /> Notice:This message(including any and all attachments)contains <br /> confidential information intended for a specific individual and <br /> purpose,and is protected by law. If you are not the intended <br /> recipient,you should delete this message. Any disclosure, <br /> copying,or dishibution of this message or the information <br /> contained herein is prohibited. <br /> Notice:By accepting this file,the recipient agrees to the following. <br /> The information on this electronic media and drawing is provided <br /> for informational purposes only.Any additions or modifications <br /> to the information contained in this electronic media by anyone <br /> other than the Pinnacle Consulting Group,inc.may result in <br /> adverse consequences that the Pinnacle Consulting Group,inc. <br /> can neither predict nor control.The recipient agrees to hold <br /> harmless,indemnify and defend the Pinnacle Consulting Group, <br /> Inc.from any and all claims,liabilities,losses,damage&costs in <br /> any way connected with the modification,misinterpretation, <br /> misuse,or reuse by others of the information provided.. <br /> From: Brett Kinney[mailto:Brett@electricmirror.com] <br /> Sent: Monday, November 16, 2015 1:35 PM <br /> To: Matt Fickel (Pinnacle Consulting Group, Inc.)<mfickel@pinnaclegrp.com> <br /> Subject:drawing for the dust collector pad <br /> Matt, <br /> Do you have the drawing spec for where the dust collectors will sit.This is needed for the Mechanical permit for <br /> Henderson? <br />
The URL can be used to link to this page
Your browser does not support the video tag.