Laserfiche WebLink
1:4W,,,,,,,, INSPECTION REPORT a53 Wt <br /> Date: 1 it IZ Permit: 0 I ID -6 C9-1 <br /> Contractor: ' 1 1 Y `w,� �..--:,% <br /> Owner: C/ • Y1/1 I V W L4 6 <br /> Site Address: <br /> Lo \,O I A-40C o 61 \/64 v`i 3 <br /> TYPE OF INSPECTION REQUESTED , '-)'' <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork o ❑Footing ❑ Rough In Fill Rough In <br /> Slab/Conduit ❑Foundation ❑ Ceiling Grid El Ceiling Grid <br /> ❑Rough In 1 ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service `•�('?- ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Groundin ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SI WORK ❑Roof Nailing ❑ Rough In/Service Hot Water Tank <br /> ;❑Footing drains ❑Ceiling Grid ❑ Refrigeration ❑ Rough In <br /> ❑Roof drains ❑I Building Final ❑Gas Pipe Final 0 HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVALPARTIAL APPROVAL FINAL APPROVAL THIS PER <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> OK FOR C.O. El VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑i CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Ilk ,I< kr <br /> /f • <br /> Inspector: ig....41‘ <br /> Date: <br /> EIR 14'09) ► �R �[. FORM &PROMOTIONS•425 438-8900 <br />