My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> B. In the event any picketing or other concerted activity by employees involved in a labor Dispute <br /> with the Contractor or its Subcontractors or Suppliers interferes in any way with access to the <br /> Owner's property by any persons, the Contractor shall promptly and expeditiously take all <br /> reasonable actions to eliminate or minimize such interference,including but not limited to: <br /> 1. Utilizing all reasonable means of restricting any picketing to a single entrance to the Owner's <br /> property; <br /> 1 2. Posting notices or signs which advise interested persons and labor organizations that a <br /> particular entrance to the Owner's property is for the employees of"primary" or, as the case <br /> may be, "neutral" employers; <br /> ' 3. Policing entrances to ensure that only authorized personnel may use those entrances; <br /> 4. Notifying all interested labor organizations of the "primary" or "neutral" status of particular <br /> entrances; and <br /> 5. In the event any such picketing or concerted activity is unlawful or has a secondary impact <br /> upon the employees of neutral employers, promptly and expeditiously taking appropriate <br /> ' action to seek recourse through the appropriate governmental agency or state or federal courts <br /> to limit the location of such picketing so as to reduce the impact thereof upon neutral <br /> employers. <br /> ' C. The Owner will cooperate with the Contractor to accomplish the foregoing actions and will <br /> render assistance as may be in the best interests of the Owner. However, the Owner shall have <br /> the right to direct the Contractor to modify any of the foregoing actions the Contractor has taken <br /> ' or plans to take or to overrule such actions, to designate the entrances to be used as "primary" or <br /> "neutral" entrances, and to take appropriate legal action in order to protect the Owner's property <br /> and interests. In any event,the Contractor shall be liable for all Delays and costs, including costs <br /> ' to the Owner, and actual damages resulting from the relocation, rerouting, Delays or actions <br /> required to maintain the uninterrupted progress of the Work. Failure by the Contractor to take the <br /> actions described above or to comply with the directives of the Owner shall be considered a <br /> breach of this Contract and the Owner may terminate the Contract or suspend the Contractor as <br /> provided in this Contract. <br /> ARTICLE 8 MATERIAL,EQUIPMENT,WORKMANSHIP AND CONSTRUCTION <br /> UTILITIES <br /> 8.1 General <br /> 1 A. Unless otherwise specifically stated in the Contract Documents, the Contractor shall provide and <br /> pay for materials, labor, tools, Equipment, water, light, power, transportation, supervision, and <br /> ' temporary construction of any nature, and other services and facilities of any nature, whatsoever <br /> necessary, to execute,complete and deliver the Work within the specified time. Contractor shall <br /> be liable for all power and water costs until Substantial Completion,whether such power or water <br /> is provided by temporary or permanent facilities. Owner shall not be liable for any costs or <br /> ' Delays arising out of or caused by the availability or lack of availability of permanent power or <br /> utilities. Material and Equipment shall be new and of the specified quality. Equipment offered <br /> shall be new or current specified models. This requirement does not apply to minor details, or to <br /> thoroughly demonstrated improvements indesign or in materials of construction. Construction <br /> Work shall be executed in conformity with the standard practice of the trade. <br /> PSO6 REROUTE 007213 -33 <br /> WO NO.—UP3583 MAY 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.