My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> ' CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 72 13 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> 4. satisfactorily correct or repair or remove and replace any damage to other Work,to the work <br /> of others or other land or areas resulting there from. <br /> ' B. If Contractor does not promptly comply with the terms of Owner's written instructions, or in an <br /> emergency where Delay would cause serious risk of loss or damage, Owner may have the <br /> defective Work corrected or repaired or may have the rejected Work removed and replaced. All <br /> claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, <br /> architects, attorneys, and other professionals and all court or arbitration or other dispute <br /> resolution costs) arising out of or relating to such correction or repair or such removal and <br /> replacement (including but not limited to all costs of repair or replacement of Work of others) <br /> ' will be paid by Contractor. <br /> C. The Owner is hereby authorized to make such repairs if, ten(10) days after giving of such notice <br /> to the Contractor, the Contractor has failed to make or undertake the repairs with due diligence. <br /> In case of an emergency where, in the opinion of the Owner, Delay could cause serious loss or <br /> damage,repairs may be made prior to or concurrent with notice being sent to the Contractor. All <br /> expenses in connection with such repairs will be charged to the Contractor. <br /> ' D. In special circumstances where a particular item of equipment is placed in continuous service <br /> before Substantial Completion of all the Work,the correction period for that item may start to run <br /> from an earlier date if so provided in the Specifications. <br /> E. Where defective Work (and damage to other Work resulting there from) has been corrected or <br /> ' removed and replaced under this Paragraph 8.7, the correction period hereunder with respect to <br /> such Work will be extended for an additional period of one year after such correction or removal <br /> and replacement has been satisfactorily completed. <br /> ' F. Contractor's obligations under this Paragraph 8.10 are in addition to any other obligation or <br /> warranty. The provisions of this Paragraph 8.10 shall not be construed as a substitute for or a <br /> waiver of the provisions of any applicable statute of limitation or repose. <br /> ' ARTICLE 9 MEASUREMENT AND PAYMENT <br /> ' 9.1 Payments to Contractor <br /> A. Schedule of Values <br /> ' 1. The Contractor shall submit a Schedule of Values at least fifteen (15) days prior to <br /> submitting its first Application for Payment. If the Project contains Unit Price Work, in <br /> whole or in part,then the Schedule of Values for that portion of the Work shall also be based <br /> on unit prices. If the Bid form calls for a lump sum price, in whole or in part, then the <br /> ' Schedule of Values shall: reasonably allocate the Contract Sum among the various portions <br /> of the Work;be complete;be organized to include detailed breakdown of each major unit of <br /> the Work; be organized to correspond to Contractor's schedule; break down the Contract <br /> ' Sum showing the value assigned to each part of the Work; include an allowance for profit <br /> and Overhead; include Unit Price Work, if and to the extent indicated on the Bid form; be so <br /> organized as to facilitate assessment of work and payment of Subcontractors; and be <br /> balanced. To the greatest extent possible, the breakdown shall use the same tasks or units as <br /> the Contractor's schedule. Contractor shall provide documentation substantiating the cost <br /> allocation if asked by the Owner's Representative. Upon acceptance of the Schedule of <br /> PSO6 REROUTE 007213 -39 <br /> WO NO.—UP3583 MAY 2016 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.