My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 72 13 1 <br /> SPECIAL PROVISIONS GENERAL CONDITIONS <br /> 2. Owner will pay for mobilization for off-site preparatory work for Force Account items I <br /> provided that Notice has been provided sufficiently in advance to allow the Owner's <br /> Representative to witness the activity,if desired. <br /> B. Any costs experienced during mobilization activities for labor, equipment, materials or services <br /> shall be listed in that section of the Force Account summary and paid accordingly. <br /> 9.13 For Contractor Markup on Subcontractor's Work. ' <br /> A. When Work is performed on a Force Account basis by one or more approved Subcontractors, by <br /> lower-tier Subcontractors or Suppliers, or through invoice by firm(s) acting in the manner of a <br /> Subcontractor,the Contractor will be allowed an additional markup,from the table below, applied <br /> to the costs computed for Work done by each Subcontractor through 9.9.A, 9.7.B., 9.7.C, and <br /> 9.7.D, to compensate for all administrative costs, including project Overhead, general company <br /> Overhead,profit,bonding,insurance,Business&Occupation tax,and any other costs incurred. <br /> B. A firm may be considered to be acting as a Subcontractor when the Owner's Representative <br /> observes one or more of the following characteristics: <br /> 1. The person in charge of the firm's activities takes an active role in managing the overall <br /> project, including extensive coordination, interpretation of Drawings, interaction with the <br /> Contracting Agency or management of a complex and interrelated operation. <br /> 2. Rented equipment is provided fueled, operated and maintained by the firm. Operators of <br /> rented equipment are supervised directly by the firm's representative. There is a little <br /> interaction between the Contractor and the employees of the firm. <br /> 3. The firm appears to be holding the risk of performance and quality of the Work. <br /> 4. The firm appears to be responsible for liability arising from the Work. I <br /> C. Markups on Work Performed by Subcontractor(s): <br /> 1. On amounts paid for Work performed by each Subcontractor on each Force Account and ' <br /> calculated through 9.6.1-4: <br /> a. Up to$25,0000 <br /> 1) 12%markup <br /> b. On amounts greater than$25,000 up to$100,000 <br /> 1) 10%markup <br /> c. On amounts greater than$100,000 <br /> 1) 7%markup <br /> D. The amounts and markup rates shall be calculated separately for each Subcontractor on each <br /> Force Account item established. <br /> E. The payments provided above shall be full payment for all Work done on a Force Account basis. <br /> The calculated payment shall cover all expenses of every nature, kind and description, including <br /> those listed above and any others incurred on the Work being paid through Force Account. <br /> Nothing in this provision shall preclude the Contractor from seeking an extension of time or time- <br /> related damages to unchanged Work arising as a result of Force Account Work. The amount and <br /> costs of any work to be paid by Force Account shall be computed by the Owner's Representative <br /> and the result shall be final as provided in 3.2 Owner's Representative. <br /> PSO6 REROUTE 007213 -50 <br /> WO NO.—UP3583 MAY 2016 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.