McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CITY OF EVERETT PUBLIC WORKS SECTION 01 30 00 <br /> ADMINISTRATIVE REQUIREMENTS <br /> 8. Inspections by authorities having jurisdiction. <br /> 9. Certificate of Occupancy and transfer of insurance responsibilities. <br /> 10. Partial release of retainage. <br /> 11. Final cleaning. <br /> 12. Preparation for final inspection. <br /> 13. Closeout Submittals: <br /> a. Project record documents. <br /> b. Operating and maintenance documents. <br /> c. Operating and maintenance materials. <br /> d. Affidavits. <br /> 14. Final Application for Payment. <br /> 15. Contractor's demobilization of Site. <br /> 16. Maintenance. <br /> E. Record minutes and distribute copies to participants within two days after meeting, with <br /> electronic copies Engineer,City,Property Owner and those affected by decisions made. <br /> PART 2-PRODUCTS-Not Used <br /> PART 3 -EXECUTION <br /> 3.1 ALTERATION PROCEDURES <br /> A. Entire facility will be occupied for normal operations during progress of construction. I <br /> Cooperate with Property Owner in scheduling operations to minimize conflict and to permit <br /> continuous usage. <br /> 1. Perform Work not to interfere with operations of occupied areas. r <br /> 2. Keep utility and service outages to a minimum and perform only after written approval of <br /> Property Owner. <br /> 3. Clean Property Owner-occupied areas daily. Clean spillage, overspray, and heavy <br /> collection of dust in Property Owner-occupied areas immediately. <br /> B. Materials: As specified in product Sections; match existing products with new products for <br /> patching and extending Work. <br /> C. Employ skilled and experienced installer to perform alteration and renovation Work. <br /> D. Cut,move,or remove items as necessary for access to alterations and renovation Work. Replace <br /> and restore at completion. <br /> E. Remove unsuitable material not marked for salvage, including rotted wood, corroded metals, <br /> and deteriorated masonry and concrete. Replace materials as specified for finished Work. <br /> F. Remove debris and abandoned items from area and from concealed spaces. , <br /> G. Prepare surface and remove surface finishes to permit installation of new Work and finishes. <br /> PSO6 REROUTE 013000-4 <br /> WO NO.—UP3583 MAY 2016 <br /> 1 <br />