Laserfiche WebLink
' CITY OF EVERETT PUBLIC WORKS SECTION 01 33 00 <br /> SUBMITTAL PROCEDURES <br /> SECTION 01 33 00-SUBMITTAL PROCEDURES <br /> PART 1 -GENERAL <br /> 1.1 SECTION INCLUDES <br /> A. Definitions. <br /> B. Submittal procedures. <br /> C. Proposed product list. <br /> iD. Product data. <br /> E. Use of electronic CAD files of Project Drawings. <br /> F. Shop Drawings. <br /> G. Samples. <br /> H. Design data. <br /> I. Test reports. <br /> J. Certificates. <br /> K. Manufacturer's instructions. <br /> L. Manufacturer's field reports. <br /> M. Erection Drawings. <br /> N. Construction photographs. <br /> O. Contractor review. <br /> P. Engineer review. <br /> 1.2 DEFINITIONS <br /> A. Action Submittals: Written and graphic information and physical samples that require <br /> Engineer's responsive action. <br /> B. Informational Submittals: Written and graphic information and physical Samples that do not <br /> require Engineer's responsive action. Submittals may be rejected for not complying with <br /> requirements. <br /> PSO6 REROUTE 013300- 1 <br /> WO NO.—UP3583 MAY 2016 <br /> I <br />