My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' CITY OF EVERETT PUBLIC WORKS SECTION 01 33 00 <br /> SUBMITTAL PROCEDURES <br /> ' 1.11 CERTIFICATES <br /> A. Informational Submittal: Submit certification by manufacturer, installation/application <br /> Subcontractor,or Contractor to Engineer, in quantities specified for Product Data. <br /> B. Indicate material or product conforms to or exceeds specified requirements. Submit supporting <br /> reference data,affidavits, and certifications as appropriate. <br /> 1 C. Certificates may be recent or previous test results on material or product but must be acceptable <br /> to Engineer. <br /> 1.12 MANUFACTURER'S INSTRUCTIONS <br /> ' A. Informational Submittal: Submit manufacturer's installation instructions for Engineer's <br /> knowledge as Contract administrator or for Owner. <br /> B. Submit printed instructions for delivery, storage, assembly, installation, startup, adjusting, and <br /> finishing,to Engineer in quantities specified for Product Data. <br /> C. Indicate special procedures, perimeter conditions requiring special attention, and special <br /> ' environmental criteria required for application or installation. <br /> 1.13 MANUFACTURER'S FIELD REPORTS <br /> A. Informational Submittal: Submit reports for Engineer's knowledge as Contract administrator or <br /> for Owner. <br /> ' B. Submit report within 24 hours of observation to Engineer for information. <br /> ' C. Submit reports for information for assessing conformance with information given and design <br /> concept expressed in Contract Documents. <br /> 1 1.14 ERECTION DRAWINGS <br /> A. Informational Submittal: Submit Drawings for Engineer's knowledge as Contract administrator <br /> or for Owner. <br /> B. Submit Drawings for information assessing conformance with information given and design <br /> concept expressed in Contract Documents. <br /> C. Data indicating inappropriate or unacceptable Work may be subject to action by Engineer or <br /> Owner. <br /> 1 <br /> 1.15 CONSTRUCTION PHOTOGRAPHS <br /> ' A. Provide photographs of Site and construction throughout progress of Work produced by <br /> photographer acceptable to Engineer. <br /> PSO6 REROUTE 013300-5 <br /> WO NO.—UP3583 MAY 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.