My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS SECTION 01 33 00 <br /> SUBMITTAL PROCEDURES <br /> C. Submittals made by Contractor that are not required by Contract Documents may be returned <br /> without action. <br /> D. Submittal approval does not authorize changes to Contract requirements unless accompanied by <br /> ' Change Order,Field Order,or Work Change Directive. <br /> E. Owner may withhold monies due to Contractor to cover additional costs beyond the second <br /> submittal review. <br /> F. The returned submittal will indicate one of the following actions: <br /> 1. If the review indicates that the material, equipment, or work method is in general <br /> conformance with the design concept and complies with the contract drawings and <br /> ' specifications, the submittal copies will be marked "NO EXCEPTIONS TAKEN." In <br /> this event the Contractor may begin to implement the work method or incorporate the <br /> material or equipment covered by the submittal. <br /> 2. If the review indicates that the submittal is insufficient and that limited corrections <br /> are required, the submittal copies will be marked "FURNISH AS CORRECTED." The <br /> CONTRACTOR may begin implementing the work method or incorporating the material <br /> or equipment covered by the submittal, in accordance with the noted corrections. Where <br /> submittal information will be incorporated in operation and maintenance data,a corrected <br /> copy shall be provided within 30 days,otherwise no further action will be required. <br /> 3. If the review reveals that the submittal is insufficient or contains incorrect data, the <br /> ' submittal copies will be marked "CONFIRM." If the comments are of a nature that can <br /> be confirmed without a resubmittal, the submittal copies will be further marked <br /> "CONFIRM." If the comments require a revision and resubmittal, the submittal copies <br /> ' will be further marked "REVISE AND RESUBMIT." Except at his own risk, the <br /> CONTRACTOR shall not undertake work covered by this submittal until the attached <br /> comments have been either confirmed by a separate written communication or the <br /> ' submittal has been revised, resubmitted, and returned marked either"NO EXCEPTIONS <br /> TAKEN"or"FURNISH AS CORRECTED." <br /> 1 4. Submittals may be marked"REJECTED"for not complying with requirements. <br /> PART 2-PRODUCTS -Not Used <br /> PART 3 -EXECUTION-Not Used <br /> END OF SECTION 01 33 00 <br /> PSO6 REROUTE 013300 -7 <br /> WO NO.—UP3583 MAY 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.