My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SECTION 01 40 00 <br /> PSO6 REROUTE QUALITY REQUIREMENTS <br /> ' D. Cooperate with independent firm; furnish samples of materials, design mix, equipment, tools, <br /> storage, safe access,and assistance by incidental labor as requested. <br /> 1. Notify Engineer and independent firm 24 hours before expected time for operations <br /> ' requiring services. <br /> 2. Make arrangements with independent firm and pay for additional Samples and tests <br /> required for Contractor's use. <br /> ' E. Employment of testing agency or laboratory shall not relieve Contractor of obligation to <br /> perform Work according to requirements of Contract Documents. <br /> ' F. Retesting or re-inspection required because of nonconformance with specified or indicated <br /> requirements shall be performed by same independent firm on instructions from Engineer. <br /> Payment for retesting or re-inspection will be charged to Contractor by deducting testing <br /> ' charges from Contract Sum/Price. <br /> G. Agency Responsibilities: <br /> 1 1. Test Samples of mixes submitted by Contractor. <br /> 2. Provide qualified personnel at Site. Cooperate with Engineer and Contractor in <br /> performance of services. <br /> 3. Perform indicated sampling and testing of products according to specified standards. <br /> 4. Ascertain compliance of materials and mixes with requirements of Contract Documents. <br /> 5. Promptly notify Engineer and Contractor of observed irregularities or nonconformance of <br /> Work or products. <br /> 6. Perform additional tests required by Engineer. <br /> 7. Attend preconstruction meetings and progress meetings,when requested by Engineer. <br /> H. Agency Reports: After each test, promptly submit electronic copies of report to Engineer, <br /> Contractor, and authorities having jurisdiction. When requested by Engineer, provide <br /> interpretation of test results. <br /> Limits on Testing Authority: <br /> ' 1. Agency or laboratory may not release, revoke, alter, or enlarge on requirements of <br /> Contract Documents. <br /> 2. Agency or laboratory may not approve or accept any portion of the Work. <br /> 3. Agency or laboratory may not assume duties of Contractor. <br /> 1 4. Agency or laboratory has no authority to stop the Work. <br /> PART 2-PRODUCTS -Not Used <br /> ' PART 3 -EXECUTION-Not Used <br /> END OF SECTION 01 40 00 <br /> ' PSO6 REROUTE 014000-3 <br /> WO NO.-UP3853 MAY 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.