My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 21 13 <br /> SPECIAL PROVISIONS INSTRUCTIONS TO BIDDERS <br /> B. Failure to complete and fully execute the aforementioned forms and to submit them with the <br /> 111 Bid may result in rejection of Bid. <br /> C. The following forms are to be executed after the award of Contract: <br /> 1. Contract: This Contract to be executed by the successful Bidder in duplicate within 14 <br /> calendar days after the award date. <br /> 2. Payment and Performance Bond: This form is to be executed by the successful Bidder <br /> and his surety company in triplicate. The amount of these bonds shall be 100 percent of <br /> the Total Bid Amount and shall be submitted with the Contract. <br /> 3. Proof of Insurance: Insurance certificates and endorsements shall be obtained and <br /> maintained in force in accordance with DOCUMENT 007213, Part 15 "Liability and <br /> Insurance",of the Contract Documents. <br /> 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds must file <br /> with each bond a certified and effectively dated copy of their Power of Attorney. <br /> 5. Statement of Intent to Pay Prevailing Wage(L&I Form F700-029-000)and Affidavit <br /> of Wages Paid (F700-007-000) from the Contractor, Subcontractor and agents to the <br /> Subcontractor shall be submitted to the Employment Standards Division, State <br /> Department of Labor and Industries, Olympia, Washington. If the prime contract is over <br /> $1,000,000, then Contractor also needs to submit L&I Form F700-164-000 (Affidavit of <br /> Wages Paid EHB 2805 Addendum). <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor Form <br /> WH347): Contractors, Subcontractors, and agents to Subcontractors using Payroll Form <br /> WH347)may use State of Compliance found on back of form. <br /> 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH 348). Contractors, <br /> Subcontractors, or agents to Subcontractors not using Payroll Form WH347 shall attach <br /> the Statement of Compliance Form WH 348 to each payroll. <br /> 8. Approval of Subcontractors: Contractors shall request approval of Subcontractors on a <br /> form provided by the City prior to their working on the Site. <br /> 9. Construction Progress Schedule: To be submitted as required by Document 00 72 13, <br /> Part 5 "Progress and Completion", of the Contract Documents by the Contractor within <br /> ten calendar days, or such time as determined by the City, after the date of receipt of <br /> Notice to Proceed. <br /> 10. Traffic Control Plan: Traffic Control Plans are included in the contract documents. If, <br /> and to the extent, such plans are not sufficient, complete or adequate to support the <br /> Bidder's planned means and methods of performing the Work, the Bidder must develop <br /> an adequate,complete and sufficient traffic control plan at its cost,that shall be submitted <br /> for the City's approval prior to construction. Deviation from the Traffic Control Plan <br /> must be submitted by the Contractor and approved by the City prior to construction. <br /> 11. Disposal Sites: Provide the City with the location of all disposal sites to be used, and <br /> also provide copies of the permits and approvals for such disposal sites. The Contractor <br /> shall provide the City with copies of all permits for disposal and storage of surplus <br /> materials within ten calendar days after award of the Contract. <br /> r <br /> PSO6 REROUTE 002113 - 11 <br /> WO NO.—UP3583 MAY 2016 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.