My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 31 19 <br /> SPECIAL PROVISIONS EXISTING CONDITION INFORMATION <br /> DOCUMENT 00 31 19-EXISTING CONDITION INFORMATION <br /> 1.1 EXISTING CONDITION INFORMATION <br /> A. This Document with its referenced attachments is part of the Procurement and Contracting <br /> Requirements for Project. They provide Owner's information for Bidders' convenience and are <br /> intended to supplement rather than serve in lieu of the Bidders' own investigations. They are <br /> made available for Bidders' convenience and information, but are nota warranty of existing <br /> conditions. This Document and its attachments are not part of the Contract Documents. <br /> B. Existing drawings that include information on existing conditions including previous <br /> construction at Project site are available for viewing at the office of City. <br /> C. Survey information that includes information on existing conditions, prepared by Reid <br /> Middleton,Inc.,dated March 8,2016,is available for viewing as part of Drawings. <br /> D. Geotechnical Engineering Report that includes information on existing conditions, prepared by <br /> Shannon and Wilson,Inc., is available for viewing as part of the Appendix. <br /> The project is within a Model Toxics Control Act(MTCA) site. Environmental testing of soil <br /> and water samples collected along the project utility corridor were conducted and results are <br /> presented in the Appendix of the Geotechnical Engineering Report. <br /> E. Related Requirements: <br /> 1. Document 002113 "Instructions to Bidders" for the Bidder's responsibilities for <br /> 1 examination of Project site and existing conditions. <br /> 2. Appendix A "Geotechnical Engineering Report" for reports and soil-boring data from <br /> geotechnical investigations that are made available to bidders. <br /> I <br /> END OF DOCUMENT 00 31 19 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> PSO6 REROUTE 003119 - 1 <br /> WO NO.—UP3583 MAY 2016 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.