My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 41 13 <br /> SPECIAL PROVISIONS BID FORM-(SINGLE-PRIME CONTRACT) <br /> I <br /> 1 15. 1 EA Furnish and Install New 36"Flap S C,/D 0 $ ,j J ©O <br /> Gate <br /> I <br /> 16. 2 EA Furnish and Install New 72" / 00 0 $ 37'Q0 to O 0 <br /> Manhole <br /> I 200 CY Furnish and Install Gravel Backfill 3 $ / 20 U Oa <br /> 1�' for Bedding <br /> I 800 CY Furnish and Install Structural Fill $ �� fo Obi <br /> ) <br /> 18. (Crushed Surfacing Base Course) <br /> I19. 320 TON Furnish and Install Asphalt Paving f- ° $ `%00 o 00 <br /> ' 20. 700 TON Removal and Disposal of Soil/Waste j61-1P---A9 <br /> Materials Managed as Contaminated �h47 $ <br /> ff' 3�, y00r0o <br /> 21 1300 TON Non-Contaminated Material $ _ 44/' Removal and Disposal /-4/ <br /> 22. FA Force Account $50,000.00 <br /> ITOTAL BID $ ',?O 3 yce, 0(.2 <br /> 1.3 ACCEPTANCE <br /> I <br /> A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid closing date. <br /> B. If this Bid is accepted by the Owner within the time period stated above,we will: <br /> I <br /> 1. Execute the Agreement within 14 days of receipt of Notice of Award. <br /> 2. Furnish the required 100% payment and 100% performance bonds within 14 calendar <br /> days of receipt of Notice of Award in the form described in Supplementary Conditions. <br /> I3. Commence Work within seven calendar days after receipt of Notice to Proceed. <br /> If this Bid is accepted within the indicated time,and we fail to commence the Work or we fail to <br /> IC. <br /> provide the required bonds, the Bid security shall be forfeited as damages to the Owner by <br /> reason of our failure, limited in amount to the lesser of the face value of the Bid security or the <br /> difference between this Bid and the Bid upon which Contract is signed. <br /> ID. In the'event our Bid is not accepted within the time stated above, the required Bid security will <br /> be returned to the undersigned,according to the provisions of the Instructions to Bidders,unless <br /> IPSO6 REROUTE 004113 -3 <br /> WO NO. -UP3583 MAY 2016 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.