My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 11 13 <br /> SPECIAL PROVISIONS ADVERTISEMENT FOR BIDS <br /> 1 DOCUMENT 00 11 13 -ADVERTISEMENT FOR BIDS <br /> 1.1 PROJECT INFORMATION <br /> A. Notice to Bidders: Bidders may submit bids for Project as described in this Document. Submit <br /> bids according to the Instructions to Bidders. <br /> B. Project Identification: UP3583 PUGET SOUND OUTFALL NO. 6(PSO6)REROUTE. <br /> 1. Project Location: 2900 TERMINAL AVE,EVERETT,WA 98201. <br /> C. Owner: City of Everett, 3200 Cedar St,Everett,WA 98201. <br /> D. Engineer: Arnie Roshak,P.E., City of Everett Public Works,425-257-7249. <br /> E. Property Owner: Port of Everett,P.O.Box 538,Everett,WA 98206. <br /> F. Project Description: The Project includes, but is not limited to: construction of new combined <br /> sewer outfall pipe consisting of approximately 182 LF of polypropylene pipe, replacement of <br /> flap gate and two new manholes, including one pile supported manhole. Construction of the <br /> new combined sewer pipe will include demolition and replacement of bulkhead wall tie backs, <br /> where existing tie backs conflict with installation of the new pipe. The project is located within <br /> the Port of Everett Property. <br /> 1. Engineer's estimate for this Project is$583,160. <br /> 1.2 BID SUBMITTAL AND OPENING <br /> A. Owner will receive sealed lump sum bids until the Bid Time on the Bid Date at the Office of the <br /> City Clerk at the location given below. Bids will not be received thereafter. <br /> 1. Bid Date: June 14,2016. <br /> 2. Bid Time: 2:00 p.m., local time. <br /> 3. Location: 8th Floor Hearing Room,2930 Wetmore Ave,Everett,WA 98201. <br /> B. All bids must be submitted on upon the forms provided by Owner for this purpose. <br /> C. At the Bid Time, the Bids will be publicly opened and read aloud at the Office of the City <br /> IClerk. <br /> D. The City reserves the right to reject any and all bids and to waive any irregularities or <br /> informalities. <br /> E. No bidder may withdraw their bid after the Bid Time, except as otherwise provided in <br /> DOCUMENT 002113 -INSTRUCTIONS TO BIDDERS. <br /> 1 <br /> PSO6 REROUTE 001113 - 1 <br /> WO NO.—UP3583 MAY 2016 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.