Laserfiche WebLink
II <br /> Project: <br /> Change Order No. <br /> Change Order Effective Date: <br /> Contractor and City agree as follows: I <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A,including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. I <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts,Washington State sales tax,if applicable to the <br /> Work,has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of,or related to,this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order,including, but <br /> not limited to, claims for equitable adjustment of time and compensation,delay, impact, <br /> overhead,or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition,protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition,protest,dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> II <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> 'A'V4 iii �€ � � -rY 5'sa � III �I '�17 .,„� � .r <br /> /�����'"/�� t� x f ,"z 1 "y"r R . .�: ph t r%?�Irl it �` ���IV � ���"�'f1'�Ilil dl ''N � it Ali <br /> G�1 "'t „,,'7,0,,1,-.4' i rY r�'�,Vi'i;�I II I! fur; h {41IIIII IIIA r:,(1p111 d tt k } P s ' `� II <br /> s„.,,,d *�” 2,"y : Vilal�Gli 1111 v , 51��, 1,11w 1r711�.:< k �I1,4,4,,,-fcclja."�« -..R�t..�«,r.? ._ °%3,„!:,,.,v,',-',4411,;,,,i'4,', IIS. <br /> Attest: Approved As to Form: <br /> Mayor City Clerk City Attorney I <br /> Date: Date: Date: <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> Date: Date: Date: Date: I <br /> PSO6 REROUTE 006363 -2 <br /> WO NO.—UP3583 MAY 2016 <br /> I <br />