My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McClure and Sons Inc. 7/25/2016
>
Contracts
>
Capital Contract
>
McClure and Sons Inc. 7/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 1:45:18 PM
Creation date
7/27/2016 9:27:09 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure and Sons Inc.
Approval Date
7/25/2016
Council Approval Date
7/6/2016
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Puget Sound Outfall PSO 6 Reroute
Public Works WO Number
UP 3583
Tracking Number
0000178
Total Compensation
$820,344.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McClure and Sons Inc. 3/1/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT PUBLIC WORKS DOCUMENT 00 63 65 <br /> SPECIAL PROVISIONS CHANGE ORDER-UNILATERAL <br /> As allowed by the contract, the City directs the Contractor as follows: I <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The contract sum shall be adjusted as described in this Change Order. <br /> 3. The duration of the Contract, and contractually scheduled completion date, shall be <br /> adjusted to the extent described in this Change Order. <br /> 4. Unless the Contractor timely and properly follows the procedures in the contract for <br /> seeking further equitable adjustment of time and compensation,including,but not <br /> limited to, delays,impacts,inefficiencies, overhead, and direct and indirect costs, and 111 <br /> except as otherwise expressly provided herein,the Contractor will be barred from (a) <br /> asserting any claim for further adjustment of time an compensation arising out of, or <br /> relating to, the charges described in this Change Order or work described in Exhibit A <br /> and(b) asserting an equitable adjustment of time or price arising earlier that the date of <br /> this Change Order. This provision does not apply to requests for equitable adjustment <br /> of time or price for which the Contractor timely and properly provided notice of a <br /> differing site condition,protest, dispute,claim or Contract Claim as required by the <br /> Contract Documents. If the Contract Documents establish a time period for notice of a <br /> differing site condition,protest, dispute,claim, or Contract Claim that ends after the <br /> date of this Change Order, but relates to work performed prior to the date of this <br /> Change Order, then this provision does not apply if the Contractor timely and properly <br /> submits such notice <br /> 5. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> PSO6 REROUTE 006365 -2 <br /> WO NO.—UP3583 MAY 2016 <br /> I <br />